Authorized housing units
136 units May 2026 · monthly U.S. Census Bureau Building Permits SurveyCounty pulse · public-record coverage
Cherokee County
County seat: Canton. 116,057 parcels on the county roll. 1,710 subdivisions indexed for search.
Parcel count from 2026-07-13 GIS probe; subdivision reference is grouped from parcel attributes.
Latest cited county indicators
County indicators
Stated construction value
$56,111,649 May 2026 · monthly U.S. Census Bureau Building Permits SurveyHouse-price change
+2.03% 2025 · year over year Federal Housing Finance Agency HPIMortgages originated
8,355 originations 2024 · annual CFPB/FFIEC HMDASource availability
What Cherokee makes public
County record feed
Cherokee County Wire
Permit records through Jul 17, 2026.
-
Road project M006653: I-575 FROM ETOWAH RIVER/CHEROKEE TO SR 372/PICKENS
Under Construction · Concrete Preservation · Cities: Ball Ground, Canton, Not City · Funding: NEPA · This project, selected by the State Maintenance Office, is the concrete preservation I-575 FROM ETOWAH RIVER/CHEROKEE TO SR 372/PICKENS.
-
Road project M006574: I-75 @ 4 LOCS IN CHEROKEE & GORDON COUNTY - BRIDGE REHAB
Under Construction · Bridges · Cities: Not City, Resaca · Funding: NEPA · Bridge Rehabilitation project. The work will consist of deck overlay, header repair, edge beam replacement, spall repairs, joint replacement, painting the steel beams, jacking and adjust…
-
Road project M006431: SR 108 FROM SR 20 TO SR 140
Under Construction · Resurface & Maintenance · Cities: Not City, Waleska · Funding: GEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 108 to improve the roadways current low OCI score.
-
Road project M005630: SR 92 FROM CS 734/LAUREL WOOD DRIVE TO COBB COUNTY LINE
Construction Work Program · Resurface & Maintenance · Cities: Not City, Woodstock · Funding: NEPA · SR 92 FROM CS 734/LAUREL WOOD DRIVE TO COBB COUNTY LINE
-
Road project 0019837: I-75 @ 1 LOC & SR 515 @ 1 LOC IN DISTRICT 6
Construction Work Program · Cable Barriers · Cities: Jasper, Not City · Funding: NEPA · The proposed project would install cable barriers in District 6 A1 and A2 on SR 515 from Talking Rock to approximately 2 miles south of Blue Ridge; Pickens and Gilmer Count…
-
Road project 0019702: SR 92 @ CR 769/WADE GREEN ROAD
Construction Work Program · Operational Improvement · Cities: Not City · The proposed improvement includes: Constructing additional eastbound and westbound through lanes along SR 92 between Wade Green Road and Bells Ferry Road. The lanes will be added via rest…
-
Road project 0019631: I-575 @ CR 416/TOWNE LAKE PKWY
Construction Work Program · Interchange · Cities: Not City, Woodstock · Funding: NEPA · The proposed project would make operational improvements to the existing interchange at I-575 and Towne Lake Parkway in Cherokee County and the City of Woodstock. The impro…
-
Road project 0019206: HOLLY ST FROM OLD HOLLY SPRINGS RD TO HOLLY SPRINGS PKWY-LCI
Construction Work Program · Shared Use Path · Cities: Holly Springs, Not City · Funding: NEPA · Shared use Path Holly St From Old Holly Springs Road to Holly Springs PKWY=LCI
-
Road project 0018024: SR 92 @ CS 998/MAIN STREET
Construction Work Program · Operational Improvement · Cities: Woodstock · Funding: NEPA · The proposed improvement would consist of restriping along SR 92 to provide three (3) through lanes in each direction along SR 92 between Main Street and Stonecroft Lane/…
-
Road project 0018017: SR 92 @ I-75 NB RAMP
Construction Work Program · Operational Improvement · Cities: Not City · The proposed improvement would realign the southbound approach of SR 92. The outermost southbound lane would become a dedicated southbound right turn lane. The realignment would result in…
-
Road project 0018016: SR 92 @ CR 1356/NORTHPOINT PKWY
Construction Work Program · Operational Improvement · Cities: Not City · The proposed improvement would construct a shared through/right turn lane for the southbound approach of SR 92 at Northpoint Pkwy. The improvement will also include lane realignment of th…
-
Road project 0017982: SR 140 @ SR 5 CONN
Construction Work Program · Intersection Improvement · Cities: Not City · Funding: NEPA · Improvement of Intersection of SR 140/Waleska Road @ SR 5 Conn/Reinhardt College Parkway by replacing a signaled T-intersection with a multi-lane Roundabout.
-
Road project 0017804: SR 140 @ CR 309/UNIVETER ROAD
Construction Work Program · Intersection Improvement · Cities: Not City · Funding: NEPA · The project proposes improvements to the intersection of SR 140 NS Univeter Road in Cherokee County Georgia. The improvements consist of additional left turn movements fr…
-
Road project 0017789: SR 140 FROM SR 5 BU TO N OF CS 662/MARY LANE IN CANTON
Construction Work Program · Roadway Project · Cities: Canton · Funding: NEPA · Operational improvement of intersection of SR 140 / Waleska Road from @ SR 5 BU / Riverstone Parkway to north of Mary Lane.
-
Road project 0017435: I-575 SB @ CS 779/SIXES ROAD - RAMP METERS
Construction Work Program · ITS · Cities: Holly Springs · The proposed quick response project will add Ramp Meter Traffic Signal for the SR 417/I-575 Southbound On-Ramp at Sixes Road.
-
Road project 0016598: CR 375/VAUGHN ROAD @ MILL CREEK
Construction Work Program · Bridges · Cities: Not City · Funding: NEPA · This project will replace the existing 38-ft bridge on CR 375/Vaughn Road over Mill Creek, SE of Holly Springs, in Cherokee County, Georgia. The proposed 65-ft long bridge will be constru…
-
Road project 0016597: CR 372/WATERS ROAD @ MILL CREEK
Construction Work Program · Bridges · Cities: Not City · Funding: NEPA · This project will replace the existing 40-ft bridge on CR 372/Waters Road over Mill Creek, SE of Holly Springs, in Cherokee County, Georgia. Approximate project length is 0.3 miles. The p…
-
Road project 0016509: SR 108 @ SHOAL CREEK 4.5 MI SW OF WALESKA
Under Construction · Bridges · Cities: Not City · Funding: NEPA · This project is along SR 108, about 4.5 miles southwest of Waleska in Cherokee County, Georgia. This project would replace the bridge over Shoal Creek. The proposed project consists of rebuildin…
-
Road project 0016365: SR 92 @ CR 387/TRICKUM ROAD
Under Construction · Turn Lanes · Cities: Woodstock · Funding: NEPA · This project addresses regional congestion and mobility improvements by adding dual left turn lanes along Trickum Road on the northbound and southbound approaches to the SR 92 intersection a…
-
Road project 0014133: SR 20 FROM CR 765/EAST CHEROKEE DRIVE TO SR 369
Under Construction · Widening · Cities: Not City · Funding: GEPA · This project will improve SR 20 between CR 765/EAST CHEROKEE DRIVE and SR 369 by widening the road to three lanes in each direction, adding a raised median for safety, and upgrading pedestrian …
-
Road project 0013526: BELLS FERRY RD FM N OF VICTORY DR TO S OF PORT VICTORIA WAY
Under Construction · Widening · Cities: Not City · Funding: GEPA · The goals of this project are to alleviate the present and future traffic congestion on Bells Ferry Road and to reduce crash frequency. The preliminary proposed limits are at Southfork Way on t…
-
Road project 0013525: CR 8998/BELLS FERRY RD FM N VICTORIA RD TO N OF LITTLE RIVER
Under Construction · Bridges · Cities: Not City · Funding: NEPA · This project is the Road Widening and Bridge Replacement on Bells Ferry Road at Little River. This project begins just south of the North Victoria Road / Bells Ferry Road intersection and extend…
-
Road project 0018240: HICKORY FLAT ROAD/LOWER BIRMINGHAM ROAD @ LITTLE RIVER
Construction Work Program · Bridges · Cities: Milton, Not City · Funding: NEPA · This project would replace the existing bridge carrying HICKORY FLAT ROAD/LOWER BIRMINGHAM ROAD over LITTLE RIVER in Cherokee and Fulton County
-
Road project 0018238: CS 32/CR 306/CLARITY RD @ LITTLE RIVER 8 MI NW OF ALPHARETTA
Construction Work Program · Bridges · Cities: Milton, Not City · Funding: NEPA · This project would replace the existing bridge carrying CS 32/CR 306/CLARITY RD over LITTLE RIVER approximately 8 miles northwest of ALPHARETTA, Georgia in Fulton and Cherokee Cou…
-
Road project 0003681: SR 20 FROM I-575 TO CS 579/NORTH CORNERS PKWY - PE ONLY
Construction Work Program · Widening · Cities: Canton, Cumming, Not City · Funding: GEPA · The SR 20 Improvements study area extends for approximately 24 miles, between I-575 in Canton and SR 400 in Cumming GA. The SR 20 Improvements project will widen from I-…
-
Road project 0002862: SR 20 FROM SR 369/CHEROKEE TO POST ROAD/FORSYTH
Under Construction · Widening · Cities: Not City · Funding: GEPA · “PI 0002862 is the widening and reconstruction of SR 20 from east of SR 369 in Cherokee County to west of SR 371 in Forsyth County to six lanes (three lanes in each direction) with a 20-foot ra…
-
Road project 0020938: SR 108 @ SR 140
Construction Work Program · Roundabout · Cities: Waleska · Funding: NEPA · This project proposes a single-lane roundabout to be constructed at the intersection of State route 140/Reinhardt College Parkway and State route 108 Fincher Road in the city of Waleska…
-
Road project T008971: CANTON - REHAB TXY, HNGR AREA AND TML APN
Construction Work Program · Airport · Cities: Canton · CANTON - REHAB TXY, HNGR AREA AND TML APN
-
Road project M006359: I-75 @ 3 LOCS & I-575 @ 6 LOCS - BRIDGE PRESERVATION
Under Construction · Bridges · Cities: Canton, Not City · Funding: NEPA · I-75 @ 4 LOCS & I-575 @ 6 LOCS - BRIDGE PRESERVATION. This work entails applying a polymer overlay on bridge decks and joint replacement on nine (9) bridges in Bartow, Cherokee & Gordon …
-
Road project 0020340: EV CHARGING STATION @ 1 LOC IN CHEROKEE/PICKENS COUNTY
Construction Work Program · NEVI - Charging Station · EV CHARGING STATION @ 1 LOC IN CHEROKEE/PICKENS COUNTY
-
Road project T008824: FY 2024-CHEROKEE COUNTY-SEC.5311-CAPITAL AND OPERATIONS
Construction Work Program · Rural Transit - Capital/Ops · FY 2024-CHEROKEE COUNTY-SEC.5311-CAPITAL AND OPERATIONS
-
Road project T008653: FAA GRANT 3-13-SBGP-061-2023 - CNI RELOCATE RWY 5/23 LATERAL
Construction Work Program · Airport · Cities: Ball Ground · FAA GRANT 3-13-SBGP-061-2023 - CNI RELOCATE RWY 5/23 LATERAL
-
Road project T008157: FY 2028-CHEROKEE COUNTY-SEC.5311-CAPITAL AND OPERATIONS
Construction Work Program · Rural Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2028 for Cherokee County.
-
Road project T008156: FY 2027-CHEROKEE COUNTY-SEC.5311-CAPITAL AND OPERATIONS
Construction Work Program · Rural Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2027 for Cherokee County.
-
Road project T008155: FY 2026-CHEROKEE COUNTY-SEC.5311-CAPITAL AND OPERATIONS
Construction Work Program · Rural Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2026 for Cherokee County.
-
Road project T008154: FY 2025-CHEROKEE COUNTY-SEC.5311-CAPITAL AND OPERATIONS
Construction Work Program · Rural Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2025 for Cherokee County.
-
Road project 0019244: OFF-SYSTEM SAFETY IMPROVEMENTS @ 13 LOCS IN WOODSTOCK
Under Construction · Signing · Cities: Woodstock · Funding: NEPA · The proposed project will add or replace striping on off system routes at 12 locations in Cherokee County. This project has a total project length of 2.65 miles.
-
Road project T007740: CANTON - REPLACE AIRPORT BEACON
Construction Work Program · Airport · Cities: Canton · CANTON - REPLACE AIRPORT BEACON
-
Road project 0014131: SR 20 FROM CR 281/SCOTT ROAD TO CR 762/UNION HILL ROAD
Under Construction · Widening · Cities: Not City · Funding: GEPA · This project is the widening and reconstruction of SR 20 in Cherokee County near Canton from east of Scott Rd to east of Union Hill Rd to six-lanes (three lanes in each direction) with a 20 foo…
-
Road project M006167: I-575 FROM I-75 TO ETOWAH RIVER
Under Construction · Resurface & Maintenance · Cities: Canton, Holly Springs, Not City, Woodstock · Funding: NEPA · This project, selected by the State Maintenance Office, is the resurfacing of SR 417 (I-575) to improve the current paces rating.
-
Road project T007296: FY 2024-CHEROKEE COUNTY-SEC.5311-CAPITAL AND OPERATIONS
Construction Work Program · Rural Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2024 for Cherokee County.
-
Road project T007214: FY 2023-CHEROKEE COUNTY-SEC.5311-CAPITAL AND OPERATIONS
Construction Work Program · Rural Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2023 for Cherokee County.
-
Road project T007132: FY 2022-CHEROKEE COUNTY-SEC.5311-CAPITAL AND OPERATIONS
Construction Work Program · Rural Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2022 for Cherokee County.
-
Road project T006954: CANTON – INSTALL AWOS III
Construction Work Program · Airport · Cities: Canton · CANTON – INSTALL AWOS III
-
Road project 0009164: SR 20 FM 0.34 MI E OF I-575 TO 0.15 MI E OF CR 281/SCOTT RD
Under Construction · Widening · Cities: Canton, Not City · Funding: GEPA · The proposed project will widen SR 20 to six lanes with a 20’ raised median in central Cherokee County, partially in the City of Canton. The project begins 0.34 miles east of I-575 in t…
-
Road project 0016105: SR 140 @ CR 776/AVERY ROAD
Under Construction · Turn Lanes · Cities: Not City · Funding: NEPA · This project will add a two-way left turn lane on SR 140 (Hickory Flat Highway) at the intersection of Avery Road. The two-way left turn lane was recommended in a TE study to alleviate the nu…
-
Road project 0016015: NOONDAY CREEK TRAIL EXTENSION FM SR 92 TO NOONDAY CREEK PARK
Under Construction · Multi-use Trail · Cities: Not City, Woodstock · Funding: NEPA · The proposed Noonday Creek Trail Extension will be a continuous 10’ wide concrete multi-use path that begins at Noonday Creek Park in north Cobb County and generally follows N…
-
Road project T006913: FY 2019-CHEROKEE COUNTY-SEC.5311-REPLACEMENT VEHICLE
Construction Work Program · Rural Transit - Capital/Ops · FY 2019-CHEROKEE COUNTY-SEC.5311-REPLACEMENT VEHICLE
Optional county watch
Watch Cherokee County.
Email begins only after confirmation and only when a newly collected record matches. Source cadence and lag still apply.