PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

G - Residential New Construction Permit

Gainesville · Hall County

New construction permit

This inspection phase; description: demolitio new construction permit covers G - Residential New Construction Permit in Gainesville, filed July 22, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 3 records on Hazel Street SW from Aug 3, 2025 through Aug 3, 2026, including 3 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 3, 2025 through Aug 3, 2026. The count includes this filing and only records in our database.

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect New construction work with HVAC, Gutters, Driveway/concrete, Landscaping, Security/low-voltage, Solar, Fence, Window treatment, Cleaning as common follow-on categories.

  • HVAC
  • Gutters
  • Driveway/concrete
  • Landscaping
  • Security/low-voltage
  • Solar
  • Fence
  • Window treatment
  • Cleaning

RECORD ACTIVITY

Activity timeline

  1. JULY 22, 2026

    G - Residential New Construction Permit This permit

    Permit · New construction · Inspection Phase; Description: Demolition of the current sin
  2. JUL 21, 2026

    Hall permit GRNEW26-0342: G - Residential New Construction Permit

    permit · New construction · Inspection Phase; Description: Duplex - Unit B