H - Residential Electrical Permit
This pending; description: 60a dedicated bran ev charger permit covers H - Residential Electrical Permit in Gillsville, filed August 7, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 2 records on Channel Drive from Aug 7, 2025 through Aug 7, 2026, including 2 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 7, 2025 through Aug 7, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect EV charger work with Electrician (panel upgrade), Solar as common follow-on categories.
- Electrician (panel upgrade)
- Solar
RECORD ACTIVITY
Activity timeline
-
AUGUST 7, 2026
H - Residential Electrical Permit This permit
Permit · EV charger · Pending; Description: 60A dedicated branch circuit for 48A E