O - Commercial Electrical Permit
This pending; description: install one perman electrical permit covers O - Commercial Electrical Permit in Flowery Branch, filed August 10, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 3 records on Thurmon Tanner Parkway from Aug 10, 2025 through Aug 10, 2026, including 3 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 10, 2025 through Aug 10, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
AUGUST 10, 2026
O - Commercial Electrical Permit This permit
Permit · Electrical · Pending; Description: Install one permanent power pole