Road project 0004634: MCGINNIS FERRY ROAD FROM DOUGLAS ROAD TO HOSPITAL PKWY-PH I

Under Construction · Widening · Cities: Johns Creek, Not City · Funding: GEPA · The proposed project would consist of the widening of McGinnis Ferry Road from Seven Oaks Parkway terminating approximately 1000 feet east of the Big Creek Bridge. The length of the proposed project is approximately 2.86 miles. The proposed design includes two lanes in each direction with a 20-foot raised median. The design speed is 45 mph. The proposed outside shoulder would be a 16-foot urban shoulder on the north side containing curb and gutter with a 10-foot multi-used path and on the south side would be a 12 foot-urban shoulder containing curb and gutter with 5-foot sidewalks.

NEARBY ON THE RECORD · Fulton County

  1. ROADS JAN 01 2028 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 15)

    Project type: Bridge Replacement. Construction year stated: 2028.

  2. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 1)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  3. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 12)

    Project type: Bridge Replacement. Construction year stated: 2027.

  4. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 13)

    Project type: Bridge Replacement. Construction year stated: 2027.

  5. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 14)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  6. ROADS JUL 15 2026 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006940: Test Project Created to Validate TPRO v06.01.02