Road project 0006049: SR 360 FROM NEW MACLAND ROAD/COBB TO SR 120/PAULDING

Under Construction · Widening · Cities: Not City · Funding: NEPA · Project PI 0006049, located in Cobb and Paulding Counties, proposes to reconstruct SR 360 from a two-lane facility to a four-lane, median divided facility with curb and gutter, and sidewalks. The proposed typical section includes two 12-foot lanes in each direction, separated by a 20-foot raised grass median with curb and gutter, and five foot sidewalks on both sides of the roadway. The proposed project length is approximately 6.2 miles long with 3.1 miles in Paulding County and 3.1 miles in Cobb County. The functional classification of SR 360 is an Urban Minor Arterial. The speed limit on SR 360 is 45 mph.

NEARBY ON THE RECORD · Cobb County

  1. ROADS JUL 10 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project S016266: SR 360/MACLAND RD @ GUS ROBINSON RD INSTALL RCUT

    Construction Work Program · RCUT · Routes: 0000 · Cities: Not City · SR 360/MACLAND RD @ GUS ROBINSON RD INSTALL RCUT

  2. ROADS JUL 06 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006967: I-285 @ 5 LOCS IN COBB & FULTON COUNTY - BRIDGE PREVENTATIVE

    Construction Work Program · Bridges · Routes: 0000 · Cities: Atlanta, East Point, Not City, South Fulton · The work consist of LMC deck overlay, joint replacement, painting the steel superstructure, spall/delamination re…

  3. ROADS JUN 26 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0019207: POWDER SPRINGS SILVER COMET TRAIL CONNECTOR - LCI

    Construction Work Program · Shared Use Path · Routes: 0000 · Cities: Powder Springs · Funding: NEPA · Located in the City of Powder Springs, the project begins at Pineview Drive Southwest running along Jackson Way as wel…

  4. ROADS JUN 17 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006906: SR 92 FROM E OF MABRY ROAD/COBB TO W OF SR 9/FULTON

    Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Not City, Roswell · Funding: NEPA · SR 92 FROM E OF MABRY ROAD/COBB TO W OF SR 9/FULTON

  5. ROADS MAY 15 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0021701: RAILROAD WARNING DEVICES @ 3 GNRR LOCS IN CHEROKEE & COBB

    Construction Work Program · RRX Warning Device · Routes: 0000 · Cities: Not City, Woodstock · RAILROAD WARNING DEVICES @ 3 GNRR LOCS IN CHEROKEE & COBB

  6. ROADS MAY 13 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M007023: SR 92 FROM CHEROKEE COUNTY LINE TO FULTON COUNTY LINE

    Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Not City · SR 92 FROM CHEROKEE COUNTY LINE TO FULTON COUNTY LINE