Road project 0006684: PEACHTREE RD FM SHADOWLAWN AVE TO MAPLE DR;INC MAPLE DR-LCI

Under Construction · Median Work · Cities: Atlanta · Funding: NEPA · This project consists of corridor and intersection improvements on SR 141/Peachtree Road from Shadowlawn Road (mp 0.37) to Maple Drive (mp 0.50). The project is along SR 141/Peachtree Road in the Buckhead Community Improvement District and extends a total length of 0.13 miles. The speed design for this project is 35 mph and the typical sections are as follows: The project consists of a typical section with three lanes in each direction consisting of 10-ft inside and outside lanes and an 11-ft center lane divided by a 19-ft raised landscape median (including turn lanes).except between Stratford Road to Lenox Drive, which consists of three 11-ft lanes in each direction. The project also proposes 5-ft bike lanes, header curb and a 14 to 17-ft shoulder comprised of a 6-ft landscape strip and 8 to 11-ft wide sidewalks on both sides of the roadway.

NEARBY ON THE RECORD · Fulton County

  1. ROADS JAN 01 2028 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 15)

    Project type: Bridge Replacement. Construction year stated: 2028.

  2. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 1)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  3. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 12)

    Project type: Bridge Replacement. Construction year stated: 2027.

  4. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 13)

    Project type: Bridge Replacement. Construction year stated: 2027.

  5. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 14)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  6. ROADS JUL 15 2026 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006940: Test Project Created to Validate TPRO v06.01.02

    Construction Work Program · Preliminary Engineering · Routes: 0000 · Cities: Atlanta, Not City, Port Wentworth · test 2/14 6:36 tEST 5/15