PERMITREPORTER GEORGIA

THE WIREFULTON → RECORD Nº 007035

ROADS · DEC 17 2024 · FULTON COUNTY

Road project 0007557: SR 3 NORTHSIDE DR FM WHITEHALL ST/I-20 TO I-75

Construction Work Program · Special Studies · Cities: Atlanta · Funding: NEPA · Northside Drive is a heavily traveled corridor within the City of Atlanta. Numerous Planning studies have suggested that potential projects include, but are not limited to, providing six travel lanes throughout the corridor, adequate turn lanes at intersections, a raised median, pedestrian and bicycle facilities, improved connection to I-20 and possibly a multi-modal aspect. The scoping phase will identify well defined projects for Northside Drive with adequate engineering, right-of-way, and construction cost estimates. Preliminary environmental studies will be conducted and extensive public outreach is planned.

NEARBY ON THE RECORD · Fulton County

  1. ROADS JAN 01 2028 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 15)

    Project type: Bridge Replacement. Construction year stated: 2028.

  2. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 1)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  3. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 12)

    Project type: Bridge Replacement. Construction year stated: 2027.

  4. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 13)

    Project type: Bridge Replacement. Construction year stated: 2027.

  5. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 14)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  6. ROADS JUL 15 2026 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006940: Test Project Created to Validate TPRO v06.01.02

    Construction Work Program · Preliminary Engineering · Routes: 0000 · Cities: Atlanta, Not City, Port Wentworth · test 2/14 6:36 tEST 5/15