THE WIRE → FULTON → RECORD Nº 007035
ROADS · DEC 17 2024 · FULTON COUNTY
Road project 0007557: SR 3 NORTHSIDE DR FM WHITEHALL ST/I-20 TO I-75
Construction Work Program · Special Studies · Cities: Atlanta · Funding: NEPA · Northside Drive is a heavily traveled corridor within the City of Atlanta. Numerous Planning studies have suggested that potential projects include, but are not limited to, providing six travel lanes throughout the corridor, adequate turn lanes at intersections, a raised median, pedestrian and bicycle facilities, improved connection to I-20 and possibly a multi-modal aspect. The scoping phase will identify well defined projects for Northside Drive with adequate engineering, right-of-way, and construction cost estimates. Preliminary environmental studies will be conducted and extensive public outreach is planned.