THE WIRE → FULTON → RECORD Nº 007052
ROADS · DEC 17 2024 · FULTON COUNTY
Road project 0009395: BELT LINE CORRIDOR FROM LINDBERGH CENTER TO I-85
Construction Work Program · Bicycle/Ped. Facility · Cities: Atlanta · Funding: NEPA · The proposed mainline Atlanta BeltLine NE Trail is a 14 ft wide concrete shared-use path approximately 2.70 miles in length. The project includes approximately 2.10 miles of spur trail 12 ft in width. The project also includes several walls and bridges and a tunnel. The proposed Atlanta BeltLine NE Trail begins at the existing terminus of the Eastside Trail at the intersection of 10th Street and Monroe Drive.