THE WIREFULTON → RECORD Nº 007073

ROADS · MAR 06 2019 · FULTON COUNTY

Road project 0012586: SR 8/US 29 FROM CS 520/BOULEVARD DR/MONROE DR TO SR 10 - LCI

Under Construction · Bicycle/Ped. Facility · Cities: Atlanta · Funding: NEPA · The project will address sidewalk improvements. It will include installation of a furniture zone with street trees & pedestrian scale lighting between Monroe Dr/Blvd & Glen Iris Dr & between Ponce de Leon Place & Freedom Pkwy. Additional proposed features include raised medians between Midtown Place Shopping Center & Ponce de Leon Court & at the Freedom Pkwy intersection. A ramp & retaining wall system will be constructed on the back side of the existing CVS located in the Midtown Place shopping center. A staircase/retaining wall system will be constructed on the northwest corner of the Atlanta BeltLine Ponce de Leon overpass. The stair will be constructed against the existing Paris on Ponce building, with a retaining wall system to the west.

NEARBY ON THE RECORD · Fulton County

  1. ROADS JAN 01 2028 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 15)

    Project type: Bridge Replacement. Construction year stated: 2028.

  2. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 1)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  3. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 12)

    Project type: Bridge Replacement. Construction year stated: 2027.

  4. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 13)

    Project type: Bridge Replacement. Construction year stated: 2027.

  5. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 14)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  6. ROADS JUL 15 2026 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006940: Test Project Created to Validate TPRO v06.01.02

    Construction Work Program · Preliminary Engineering · Routes: 0000 · Cities: Atlanta, Not City, Port Wentworth · test 2/14 6:36 tEST 5/15