PERMITREPORTER GEORGIA

THE WIREFULTON → RECORD Nº 007076

ROADS · JUL 02 2019 · FULTON COUNTY

Road project 0012637: CR 1393/NEW HOPE RD FROM E OF BOAT ROCK RD TO DANFORTH RD

Under Construction · Bicycle/Ped. Facility · Cities: Not City · Funding: NEPA · The project is located in the Sandtown Community in Southwest Fulton County. The project length is approximately 9500 feet and will connect/complete the sidewalks along both sides of New Hope Road from east of Boat Rock Road to Danforth Road. The shoulder typical section will be to add 24” curb and gutter, a two-foot grass strip, and a 5-foot wide sidewalk. The existing standard lane widths are approximately 10.5-feet, and this project will widen any lanes to that width if they are found to be substandard. The project posted speed is 35 mph, and no improvements to the vertical or horizontal alignments will be made as part of this project.

NEARBY ON THE RECORD · Fulton County

  1. ROADS JAN 01 2028 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 15)

    Project type: Bridge Replacement. Construction year stated: 2028.

  2. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 1)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  3. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 12)

    Project type: Bridge Replacement. Construction year stated: 2027.

  4. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 13)

    Project type: Bridge Replacement. Construction year stated: 2027.

  5. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 14)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  6. ROADS JUL 15 2026 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006940: Test Project Created to Validate TPRO v06.01.02

    Construction Work Program · Preliminary Engineering · Routes: 0000 · Cities: Atlanta, Not City, Port Wentworth · test 2/14 6:36 tEST 5/15