PERMITREPORTER GEORGIA

THE WIREFULTON → RECORD Nº 007109

ROADS · APR 05 2022 · FULTON COUNTY

Road project 0013724: SR 279 FROM CS 567/SULLIVAN ROAD TO CS 1615/JOLLY ROAD - VRU

Under Construction · Pedestrian Crossings · Cities: College Park, Not City · Funding: NEPA · The proposed project is located on the SR 279 / Old National Hwy between Sullivan Road and Jolly Road. This project is expected to reduce the severity and frequency of crashes on this corridor with the addition of safety and operations improvements as follows: Addition of a raised median between: Sullivan Road and I-285 WB ramps Old National Parkway and Jolly Road Conversion of the intersections to a half-RCUTs (Reduced Conflict U-Turn) at: SR 279 and Old National Pkwy SR 279 and Old Bill Cook Rd SR 279 and Jolly Road Installation of Pedestrian Hybrid Beacon (PHB) signals on SR 279 at: Jolly Rd Area between Sullivan Road and I-85 WB ramps

NEARBY ON THE RECORD · Fulton County

  1. ROADS JAN 01 2028 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 15)

    Project type: Bridge Replacement. Construction year stated: 2028.

  2. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 1)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  3. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 12)

    Project type: Bridge Replacement. Construction year stated: 2027.

  4. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 13)

    Project type: Bridge Replacement. Construction year stated: 2027.

  5. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 14)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  6. ROADS JUL 15 2026 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006940: Test Project Created to Validate TPRO v06.01.02

    Construction Work Program · Preliminary Engineering · Routes: 0000 · Cities: Atlanta, Not City, Port Wentworth · test 2/14 6:36 tEST 5/15