THE WIRE → FULTON → RECORD Nº 007109
ROADS · APR 05 2022 · FULTON COUNTY
Road project 0013724: SR 279 FROM CS 567/SULLIVAN ROAD TO CS 1615/JOLLY ROAD - VRU
Under Construction · Pedestrian Crossings · Cities: College Park, Not City · Funding: NEPA · The proposed project is located on the SR 279 / Old National Hwy between Sullivan Road and Jolly Road. This project is expected to reduce the severity and frequency of crashes on this corridor with the addition of safety and operations improvements as follows: Addition of a raised median between: Sullivan Road and I-285 WB ramps Old National Parkway and Jolly Road Conversion of the intersections to a half-RCUTs (Reduced Conflict U-Turn) at: SR 279 and Old National Pkwy SR 279 and Old Bill Cook Rd SR 279 and Jolly Road Installation of Pedestrian Hybrid Beacon (PHB) signals on SR 279 at: Jolly Rd Area between Sullivan Road and I-85 WB ramps