PERMITREPORTER GEORGIA

THE WIRECOBB → RECORD Nº 007122

ROADS · DEC 17 2024 · COBB COUNTY

Road project 0013917: I-285 FM I-20/FULTON TO ATLANTA RD/COBB- W EXPRESS LN-PH II

Construction Work Program · Managed Lanes · Cities: Atlanta, Not City · Funding: NEPA · The project would consist of: Creating one Express Lane in each direction along I-285 between I-20 and I-75. Existing lanes would be maintained and a new 12’ outside lane would be constructed. The Express Lane would be separated from the general purpose lanes through the use of delineators and pavement striping. Access to the Express Lane would be provided with the use of direct access ramps connecting to the surrounding arterial system and slip ramp access to adjacent general purpose lanes. Estimated Costs*: $743 Million

NEARBY ON THE RECORD · Cobb County

  1. ROADS JUL 10 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project S016266: SR 360/MACLAND RD @ GUS ROBINSON RD INSTALL RCUT

    Construction Work Program · RCUT · Routes: 0000 · Cities: Not City · SR 360/MACLAND RD @ GUS ROBINSON RD INSTALL RCUT

  2. ROADS JUL 06 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006967: I-285 @ 5 LOCS IN COBB & FULTON COUNTY - BRIDGE PREVENTATIVE

    Construction Work Program · Bridges · Routes: 0000 · Cities: Atlanta, East Point, Not City, South Fulton · The work consist of LMC deck overlay, joint replacement, painting the steel superstructure, spall/delamination re…

  3. ROADS JUN 26 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0019207: POWDER SPRINGS SILVER COMET TRAIL CONNECTOR - LCI

    Construction Work Program · Shared Use Path · Routes: 0000 · Cities: Powder Springs · Funding: NEPA · Located in the City of Powder Springs, the project begins at Pineview Drive Southwest running along Jackson Way as wel…

  4. ROADS JUN 17 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006906: SR 92 FROM E OF MABRY ROAD/COBB TO W OF SR 9/FULTON

    Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Not City, Roswell · Funding: NEPA · SR 92 FROM E OF MABRY ROAD/COBB TO W OF SR 9/FULTON

  5. ROADS MAY 15 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0021701: RAILROAD WARNING DEVICES @ 3 GNRR LOCS IN CHEROKEE & COBB

    Construction Work Program · RRX Warning Device · Routes: 0000 · Cities: Not City, Woodstock · RAILROAD WARNING DEVICES @ 3 GNRR LOCS IN CHEROKEE & COBB

  6. ROADS MAY 13 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M007023: SR 92 FROM CHEROKEE COUNTY LINE TO FULTON COUNTY LINE

    Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Not City · SR 92 FROM CHEROKEE COUNTY LINE TO FULTON COUNTY LINE