PERMITREPORTER GEORGIA

THE WIREFULTON → RECORD Nº 007154

ROADS · DEC 17 2024 · FULTON COUNTY

Road project 0015298: CS 797/WEST LAKE AVE @ CSX #638641X & MARTA

Construction Work Program · Bridges · Cities: Atlanta · Funding: NEPA · Bridge Replacement Project - This project is a proposed bridge replacement on an offset alignment to the east, spanning over two existing CSX Transportation tracks, one proposed CSX Transportation track, and two existing MARTA tracks. The project will begin approximate 550 feet south of the existing bridge and extend approximately 500 feet north of the existing bridge. This project is located within the city of Atlanta. The project will include two traffic lanes, with a sidewalk on the west side and a shared-use path on the east side. The total project length is approximately 1300 feet or 0.3 miles, with 261.5 feet of proposed bridge, with a proposed speed of 35 MPH. Traffic will be maintained on existing bridge until proposed bridge is constructed.

NEARBY ON THE RECORD · Fulton County

  1. ROADS JAN 01 2028 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 15)

    Project type: Bridge Replacement. Construction year stated: 2028.

  2. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 1)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  3. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 12)

    Project type: Bridge Replacement. Construction year stated: 2027.

  4. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 13)

    Project type: Bridge Replacement. Construction year stated: 2027.

  5. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 14)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  6. ROADS JUL 15 2026 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006940: Test Project Created to Validate TPRO v06.01.02

    Construction Work Program · Preliminary Engineering · Routes: 0000 · Cities: Atlanta, Not City, Port Wentworth · test 2/14 6:36 tEST 5/15