ROADS · FEB 15 2021 · FULTON COUNTY

Road project 0015642: CR 614/OAKLEY ROAD @ BROADANAX CREEK 2 MI SE OF UNION CITY

Under Construction · Bridges · Cities: Not City · Funding: NEPA · This project will replace the existing 30-foot-long bridge built in 1961 over Broadanax Creek. The proposed 72-foot-long bridge will consist of one 12-foot lane in each direction with 2-foot gutters, and 6.5-foot sidewalks. The roadway approaches will consist of one 12-foot lane in each direction and a 10-foot urban border area with curb and gutter and 5-foot sidewalks. The proposed project length is 1050 feet (0.20 miles). The project is located approximately 2 miles southeast of Union City and begins approximately 585 feet south of the existing bridge and ends approximately 434 feet north of the existing bridge. Traffic will be maintained on an off-site detour utilizing Fayetteville Road and Oakley Industrial Boulevard.

NEARBY ON THE RECORD · Fulton County

  1. ROADS JAN 01 2028 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 15)

    Project type: Bridge Replacement. Construction year stated: 2028.

  2. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 1)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  3. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 12)

    Project type: Bridge Replacement. Construction year stated: 2027.

  4. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 13)

    Project type: Bridge Replacement. Construction year stated: 2027.

  5. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 14)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  6. ROADS JUL 15 2026 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006940: Test Project Created to Validate TPRO v06.01.02

    Construction Work Program · Preliminary Engineering · Routes: 0000 · Cities: Atlanta, Not City, Port Wentworth · test 2/14 6:36 tEST 5/15