ROADS · JAN 08 2020 · FULTON COUNTY

Road project 0015890: CS 654/10TH ST @ I-75/I-85; INC WILLIAMS ST & TECHWOOD DR

Under Construction · Miscellaneous Improvements · Cities: Atlanta · Funding: NEPA · The proposed project is centered on the 10th St Bridge over I-75/85. The width and number of the travel lanes along 10th Street are proposed to be reconfigured to 11' lanes with a 1' buffer to the barrier & 11' left turn lanes allowing for 9.5'sidewalks on both sides & a 10' separated 2 wy cycle track on the south side. The lanes on Williams St south of 10th St are to be narrowed to 11 ft & shifted to the west to construct a separated 2 way cycle track. The existing 42ft pavement width of Techwood Dr will be restriped to utilize the extra wide existing 22' wide northbound lane to create room for a 2 way cycle track from 10th St to the Turner Broadcasting entrance on the west side of Techwood Dr.

NEARBY ON THE RECORD · Fulton County

  1. ROADS JAN 01 2028 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 15)

    Project type: Bridge Replacement. Construction year stated: 2028.

  2. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 1)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  3. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 12)

    Project type: Bridge Replacement. Construction year stated: 2027.

  4. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 13)

    Project type: Bridge Replacement. Construction year stated: 2027.

  5. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 14)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  6. ROADS JUL 15 2026 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006940: Test Project Created to Validate TPRO v06.01.02

    Construction Work Program · Preliminary Engineering · Routes: 0000 · Cities: Atlanta, Not City, Port Wentworth · test 2/14 6:36 tEST 5/15