PERMITREPORTER GEORGIA

THE WIREFULTON → RECORD Nº 007184

ROADS · APR 01 2019 · FULTON COUNTY

Road project 0015997: PATH 400 TRAIL EXTENSION FROM WIEUCA ROAD TO LORIDANS DRIVE

Under Construction · Multi-use Trail · Cities: Atlanta · Funding: NEPA · The regional trail vision seeks to develop a connected regional trail network - including providing the opportunity to provide access to major employment centers. PATH 400 provides a critical link in the region's trail network, opening the entire north metro area to access the system and the Atlanta Beltline. PATH 400 provides critical intermodal connectivity with direct access to Lindbergh, Lenox and Buckhead MARTA stations. The expansion of the PATH 400 network is a high regional priority to provide alternative transportation in the GA 400 corridor.This project is an extension of the PATH 400 Trail network with a footprint from Wieuca Road to Loridans Drive. The PATH 400 multi-use trail system is a 12 foot poured concrete path with minimum of 2 foot shoulders on either side.

NEARBY ON THE RECORD · Fulton County

  1. ROADS JAN 01 2028 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 15)

    Project type: Bridge Replacement. Construction year stated: 2028.

  2. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 1)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  3. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 12)

    Project type: Bridge Replacement. Construction year stated: 2027.

  4. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 13)

    Project type: Bridge Replacement. Construction year stated: 2027.

  5. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 14)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  6. ROADS JUL 15 2026 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006940: Test Project Created to Validate TPRO v06.01.02

    Construction Work Program · Preliminary Engineering · Routes: 0000 · Cities: Atlanta, Not City, Port Wentworth · test 2/14 6:36 tEST 5/15