PERMITREPORTER GEORGIA

THE WIREFULTON → RECORD Nº 007221

ROADS · DEC 18 2024 · FULTON COUNTY

Road project 0016581: CS 4/BIRMINGHAM ROAD @ CHICKEN CREEK TRIB

Construction Work Program · Bridges · Cities: Milton · Funding: NEPA · Bridge replacement project of CS 4/Birmingham Road bridge over Chicken Creek tributary in Milton located approximately 6 miles north of Alpharetta. The total project length is approximately 0.5 miles. The project consists of replacing the existing 1 span bridge on County Street (CS) 4/Birmingham Road at Chicken Creek. The existing bridge, Structure ID 121-5003-0, was built in 1961 and reconstructed in 1994, and consists of one 30-foot-long span with an existing roadway width of 22.6’ and an existing deck width of 24.2’. CS 4 is functionally classified as an Urban Minor Collector and has a posted speed limit of 45 mph. The existing typical consists of two 10-foot lanes, one in each direction with 5-foot graded shoulders. The existing bridge is expected to be replaced with a new bridge on the existing alignment utilizing an offsite detour. The new bridge will have a deck width of 43.5’ wit

NEARBY ON THE RECORD · Fulton County

  1. ROADS JAN 01 2028 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 15)

    Project type: Bridge Replacement. Construction year stated: 2028.

  2. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 1)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  3. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 12)

    Project type: Bridge Replacement. Construction year stated: 2027.

  4. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 13)

    Project type: Bridge Replacement. Construction year stated: 2027.

  5. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 14)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  6. ROADS JUL 15 2026 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006940: Test Project Created to Validate TPRO v06.01.02

    Construction Work Program · Preliminary Engineering · Routes: 0000 · Cities: Atlanta, Not City, Port Wentworth · test 2/14 6:36 tEST 5/15