Road project 0016599: CS 1472/WATERS ROAD @ LONG INDIAN CREEK

Under Construction · Bridges · Cities: Alpharetta · Funding: NEPA · The project consists of replacing the existing single span 30-ft-long bridge at CS 1472/Waters Road over Long Indian Creek. The location is in the city of Alpharetta, Fulton County. The total project length is approx. 0.5 miles. The existing bridge is expected to be replaced with a new single span bridge, approx. 85-ft long, on the existing alignment with an on-site detour utilizing a temporary detour bridge parallel offset alignment to the south. The hydraulics conveyance & floodway width required that the new bridge length be increased to 85-ft long, compared to the existing 30-ft length. The proposed bridge width is 43-ft 5-inches & consists of an 11-ft lane in each direction, as well as 3-ft-wide gutters, 6-ft 6-inchwide sidewalks & 1-ft 2 !4-inch wide parapets on each side of the bridge.

NEARBY ON THE RECORD · Fulton County

  1. ROADS JAN 01 2028 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 15)

    Project type: Bridge Replacement. Construction year stated: 2028.

  2. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 1)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  3. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 12)

    Project type: Bridge Replacement. Construction year stated: 2027.

  4. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 13)

    Project type: Bridge Replacement. Construction year stated: 2027.

  5. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 14)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  6. ROADS JUL 15 2026 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006940: Test Project Created to Validate TPRO v06.01.02

    Construction Work Program · Preliminary Engineering · Routes: 0000 · Cities: Atlanta, Not City, Port Wentworth · test 2/14 6:36 tEST 5/15