PERMITREPORTER GEORGIA

THE WIREFULTON → RECORD Nº 007227

ROADS · DEC 18 2024 · FULTON COUNTY

Road project 0016605: CR 581/BETHSAIDA ROAD @ MORNING CREEK

Under Construction · Bridges · Cities: South Fulton · Funding: NEPA · Bridge replacement project of CS 581/Bethsaida Road bridge over Morning Creek approximately 4 miles west of Union City. The total project length is approx. 0.5 miles. The project consists of replacing the existing 4 span bridge at Morning Creek. The existing 120’ long bridge, Structure ID 121-0295-0, was built in 1965 & consists of four 30' long spans with an existing roadway width of 23.7’ and an existing deck width of 24.4’. CS 581 is classified as an Urban Minor Arterial with a posted speed limit of 35 mph. The existing typical consists of two 10' lanes, one in each direction with shoulder varying in width from 1.5 and 8' graded and paved shoulders. The existing bridge is expected to be replaced with a new bridge on the existing alignment. At this time its not determined if an on-site or offsite will be utilized for this project. The new bridge will have a deck width of 43.5’ with two

NEARBY ON THE RECORD · Fulton County

  1. ROADS JAN 01 2028 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 15)

    Project type: Bridge Replacement. Construction year stated: 2028.

  2. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 1)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  3. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 12)

    Project type: Bridge Replacement. Construction year stated: 2027.

  4. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 13)

    Project type: Bridge Replacement. Construction year stated: 2027.

  5. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 14)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  6. ROADS JUL 15 2026 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006940: Test Project Created to Validate TPRO v06.01.02

    Construction Work Program · Preliminary Engineering · Routes: 0000 · Cities: Atlanta, Not City, Port Wentworth · test 2/14 6:36 tEST 5/15