THE WIRE → FULTON → RECORD Nº 007241
ROADS · OCT 15 2019 · FULTON COUNTY
Road project 0017118: MIDTOWN CONNECTOR IMPROVEMENTS
Construction Work Program · Preliminary Engineering · Cities: Atlanta · Funding: NEPA · The project proposes a “deck” spanning all lanes of the combined I-75/I-85 interstate facility commonly referred to as “The Connector”, with the exception of any off ramps or on ramps currently in operation. The southern terminus of the Project is to be in the vicinity of the North Ave. bridge, realizing that the final design may extend the Project boundary slightly south of the current bridge structure. The northern terminus of the Project is to be the existing 5th Street bridge and will not extend further than the current boundaries of the existing bridge plaza, although the final design may offer some design modifications to enhance the existing plaza elements. The deck structure will support soils, trees, shrubs, walkways and trail elements, park furniture, water features, lighting elements, art installations, Connector Park administration facilities, food & beverage facilities, pavi