Road project 0017718: SR 141 @ CR 3528/WINTERS CHAPEL ROAD

Under Construction · Operational Improvement · Cities: Not City · Funding: GEPA · The proposed improvement includes the restriping to provide dual left-turn lanes along the eastbound and westbound approaches of Winters Chapel Road. The existing channelizing islands on SR 141 will be modified to allow for lanes along SR 141 to receive dual lefts. Additionally, the proposed improvement will restripe the SR 141 exit ramps to convert the shared left-turn/through lanes to exclusive through lanes. The existing U-turn lane along the southbound SR 141 exit ramp would be converted to shared U-turn/left-turn lanes. Split phase operations will be removed from this intersection.

NEARBY ON THE RECORD · Gwinnett County

  1. ROADS JUL 13 2026 · GWINNETT · GEORGIA DOT PROJECT HUB

    Road project 0019215: LOOP TRAIL FM SUGARLOAF PKWY TO ST IVES COURT - LCI

    Construction Work Program · Shared Use Path · Routes: 0000 · Cities: Not City · Funding: NEPA · Construction of a 12-foot shared use path along west side of Satellite Boulevard from Sugarloaf Parkway to Old Peachtree Roa…

  2. ROADS JUL 07 2026 · GWINNETT · GEORGIA DOT PROJECT HUB

    Road project S016260: I-85 NB @ GSP/HERO POST 51 INSTALL ON-RAMP

    Construction Work Program · Operational Improvement · Routes: 0000 · Cities: Suwanee · I-85 NB @ GSP/HERO POST 51 INSTALL ON-RAMP

  3. ROADS JUN 04 2026 · GWINNETT · GEORGIA DOT PROJECT HUB

    Road project 0020197: SR 60 & GWINNETT DRIVE @ 2 LOCS - VRU

    Construction Work Program · Signals · Routes: 0000 · Cities: Lawrenceville, Not City · Funding: NEPA · This project proposes to install pedestrian hybrid beacon (PHB) signals at two locations, SR 60 and Gwinnett Drive, i…

  4. ROADS JUN 03 2026 · GWINNETT · GEORGIA DOT PROJECT HUB

    Road project M007059: SR 8 & SR 120 FROM LAMP POST ROAD TO SR 316

    Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Not City · SR 8 & SR 120 FROM LAMP POST ROAD TO SR 316

  5. ROADS JUN 03 2026 · GWINNETT · GEORGIA DOT PROJECT HUB

    Road project M007063: SR 316 FROM I-85 TO SR 120

    Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Not City · SR 316 FROM I-85 TO SR 120

  6. ROADS JUN 01 2026 · GWINNETT · GEORGIA DOT PROJECT HUB

    Road project M007069: SR 13 FROM ROGERS BRIDGE ROAD TO SAWNEE AVE

    Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Buford, Duluth, Not City, Sugar Hill, Suwanee · SR 13 FROM ROGERS BRIDGE ROAD TO SAWNEE AVE