ROADS · DEC 19 2024 · FULTON COUNTY

Road project 0017830: CS 111/BUICE ROAD @ JOHNS CREEK

Under Construction · Bridges · Cities: Johns Creek · Funding: NEPA · This project consists of replacing the existing roadway bridge on CR 111/Buice Road over Johns Creek in Fulton County. The bridge was built in 1964 and has a sufficiency rating of 57.7. Currently, the bridge is weight limited, does not meet current bridge width requirements, and lacks pedestrian facilities. Additionally, the bridge is at risk of flooding during severe storming events. The proposed replacement will meet current design standards for load and bridge width. The proposed typical section includes two 12-foot lanes, one lane in each direction, with urban shoulders and pedestrian facilities. To mitigate the risk of flooding, the bridge elevation will be increased above the flood stage. The design speed is 45 mph.

NEARBY ON THE RECORD · Fulton County

  1. ROADS JAN 01 2028 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 15)

    Project type: Bridge Replacement. Construction year stated: 2028.

  2. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 1)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  3. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 12)

    Project type: Bridge Replacement. Construction year stated: 2027.

  4. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 13)

    Project type: Bridge Replacement. Construction year stated: 2027.

  5. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 14)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  6. ROADS JUL 15 2026 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006940: Test Project Created to Validate TPRO v06.01.02

    Construction Work Program · Preliminary Engineering · Routes: 0000 · Cities: Atlanta, Not City, Port Wentworth · test 2/14 6:36 tEST 5/15