Road project 0018265: SR 280 FROM CS 1720/WINDY HILL ROAD TO CS 1782/CONCORD ROAD
Construction Work Program · Roadway Project · Cities: Smyrna · Funding: NEPA · This project is approximately 1.5-miles along South Cobb Drive beginning at Windy Hill Road and ending at Concord Road. Existing conditions from Windy Hill Road to Powder Springs Road is 3 thru lanes in each direction, an occasional right deceleration lane, and Two Way Left Turn Lanes (TWLTL). From Powder Springs to Concord Road the section decreases to 2 thru lanes in each direction, with occasional right deceleration lane(s), and TWLTL. The proposed typical section in both directions would be 3 mainline thru lanes from Windy Hill Road to Powder Springs Road and 2 mainline thru lanes from Powder Springs Road to Concorde Road, a separate single local traffic lane with limited parallel parking, separated by Curb & Gutter (C&G) protected bicycle lanes, sidewalk, street trees, and lighting in addition to various turn lanes, and a landscaped center median. 1 new signalized intersection is pr