PERMITREPORTER GEORGIA

THE WIRECOBB → RECORD Nº 007305

ROADS · DEC 23 2024 · COBB COUNTY

Road project 0018265: SR 280 FROM CS 1720/WINDY HILL ROAD TO CS 1782/CONCORD ROAD

Construction Work Program · Roadway Project · Cities: Smyrna · Funding: NEPA · This project is approximately 1.5-miles along South Cobb Drive beginning at Windy Hill Road and ending at Concord Road. Existing conditions from Windy Hill Road to Powder Springs Road is 3 thru lanes in each direction, an occasional right deceleration lane, and Two Way Left Turn Lanes (TWLTL). From Powder Springs to Concord Road the section decreases to 2 thru lanes in each direction, with occasional right deceleration lane(s), and TWLTL. The proposed typical section in both directions would be 3 mainline thru lanes from Windy Hill Road to Powder Springs Road and 2 mainline thru lanes from Powder Springs Road to Concorde Road, a separate single local traffic lane with limited parallel parking, separated by Curb & Gutter (C&G) protected bicycle lanes, sidewalk, street trees, and lighting in addition to various turn lanes, and a landscaped center median. 1 new signalized intersection is pr

NEARBY ON THE RECORD · Cobb County

  1. ROADS JUL 10 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project S016266: SR 360/MACLAND RD @ GUS ROBINSON RD INSTALL RCUT

    Construction Work Program · RCUT · Routes: 0000 · Cities: Not City · SR 360/MACLAND RD @ GUS ROBINSON RD INSTALL RCUT

  2. ROADS JUL 06 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006967: I-285 @ 5 LOCS IN COBB & FULTON COUNTY - BRIDGE PREVENTATIVE

    Construction Work Program · Bridges · Routes: 0000 · Cities: Atlanta, East Point, Not City, South Fulton · The work consist of LMC deck overlay, joint replacement, painting the steel superstructure, spall/delamination re…

  3. ROADS JUN 26 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0019207: POWDER SPRINGS SILVER COMET TRAIL CONNECTOR - LCI

    Construction Work Program · Shared Use Path · Routes: 0000 · Cities: Powder Springs · Funding: NEPA · Located in the City of Powder Springs, the project begins at Pineview Drive Southwest running along Jackson Way as wel…

  4. ROADS JUN 17 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006906: SR 92 FROM E OF MABRY ROAD/COBB TO W OF SR 9/FULTON

    Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Not City, Roswell · Funding: NEPA · SR 92 FROM E OF MABRY ROAD/COBB TO W OF SR 9/FULTON

  5. ROADS MAY 15 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0021701: RAILROAD WARNING DEVICES @ 3 GNRR LOCS IN CHEROKEE & COBB

    Construction Work Program · RRX Warning Device · Routes: 0000 · Cities: Not City, Woodstock · RAILROAD WARNING DEVICES @ 3 GNRR LOCS IN CHEROKEE & COBB

  6. ROADS MAY 13 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M007023: SR 92 FROM CHEROKEE COUNTY LINE TO FULTON COUNTY LINE

    Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Not City · SR 92 FROM CHEROKEE COUNTY LINE TO FULTON COUNTY LINE