ROADS · DEC 19 2024 · FULTON COUNTY

Road project 0018301: SR 3/US 19 FM CS 3498/MARIETTA STREET TO CS 3352/8TH STREET

Construction Work Program · Realignment · Cities: Atlanta · Funding: NEPA · The proposed project would construct a new Northside Drive to provide two northbound and two southbound travel lanes from south of Marietta Street to 8th Street with improved intersections at Marietta Street and Tech Parkway. The project is approximately 0.45 miles long and includes concrete medians and a Reduced Conflict U-Turn (RCUT) intersection at Tech Parkway. To accommodate high pedestrian traffic in the area, a 5-12 ft sidewalk is proposed throughout the project. The project removes the existing separated northbound and southbound Northside Drive. The project will construct a new Tech Parkway intersection that ties into Northside Drive at Hampton St. Walls will be included on the east side of the road between 8th St and 10th St. South of Marietta St the road ties back into the existing bridge. CR - 07/03/2024

NEARBY ON THE RECORD · Fulton County

  1. ROADS JAN 01 2028 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 15)

    Project type: Bridge Replacement. Construction year stated: 2028.

  2. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 1)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  3. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 12)

    Project type: Bridge Replacement. Construction year stated: 2027.

  4. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 13)

    Project type: Bridge Replacement. Construction year stated: 2027.

  5. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 14)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  6. ROADS JUL 15 2026 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006940: Test Project Created to Validate TPRO v06.01.02

    Construction Work Program · Preliminary Engineering · Routes: 0000 · Cities: Atlanta, Not City, Port Wentworth · test 2/14 6:36 tEST 5/15