PERMITREPORTER GEORGIA

THE WIREFULTON → RECORD Nº 007317

ROADS · DEC 19 2024 · FULTON COUNTY

Road project 0018304: SR 3/US 19 @ CS 2368/GREENSFERRY AVE/MCDANIEL STREET

Construction Work Program · Intersection Improvement · Cities: Atlanta · Funding: NEPA · The proposed project would provide two northbound and two southbound travel lanes with a raised concrete median on Northside Drive at the intersection. The project also provides a left turn, through-right, and right turn lane on McDaniel Street WB and a left turn, and through-right on Greensferry Avenue EB. To accommodate high pedestrian volumes in the area, the sidewalk is proposed to be eight feet on Northside Drive and vary five to eight feet on Greensferry Avenue/McDaniel Street. The proposed project will be coordinated with PIs 0018303 & 0018343 to the south and PI 0018302 to the north to determine construction timing and temporary conditions until the final build out can be constructed. CR - 05/10/2024

NEARBY ON THE RECORD · Fulton County

  1. ROADS JAN 01 2028 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 15)

    Project type: Bridge Replacement. Construction year stated: 2028.

  2. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 1)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  3. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 12)

    Project type: Bridge Replacement. Construction year stated: 2027.

  4. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 13)

    Project type: Bridge Replacement. Construction year stated: 2027.

  5. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 14)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  6. ROADS JUL 15 2026 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006940: Test Project Created to Validate TPRO v06.01.02

    Construction Work Program · Preliminary Engineering · Routes: 0000 · Cities: Atlanta, Not City, Port Wentworth · test 2/14 6:36 tEST 5/15