PERMITREPORTER GEORGIA

THE WIREFULTON → RECORD Nº 007343

ROADS · DEC 19 2024 · FULTON COUNTY

Road project 0019202: CS 3695/PEACHTREE ST FROM ELLIS ST TO BAKER ST - LCI

Construction Work Program · Roadway Project · Cities: Atlanta · Funding: NEPA · This project caps the interstates 75/85 in downtown Atlanta, known as the Stitch, and reconnects the local street grid with pedestrian-oriented, multimodal streets enhancing pedestrian infrastructure with approximately 5.7-acres of greenspace, catalyzing affordable housing, and improving the living environment for its residents. PI 0019180 and PI 0020769 include the cap, park, and multimodal street enhancements. The cap portion of the project is being delivered Design Build. The multimodal street enhancements and park are being delivered Design Bid Build. PI 0019202 includes Peachtree Street multimodal street enhancements and is being delivered Design Bid Build.

NEARBY ON THE RECORD · Fulton County

  1. ROADS JAN 01 2028 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 15)

    Project type: Bridge Replacement. Construction year stated: 2028.

  2. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 1)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  3. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 12)

    Project type: Bridge Replacement. Construction year stated: 2027.

  4. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 13)

    Project type: Bridge Replacement. Construction year stated: 2027.

  5. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 14)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  6. ROADS JUL 15 2026 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006940: Test Project Created to Validate TPRO v06.01.02

    Construction Work Program · Preliminary Engineering · Routes: 0000 · Cities: Atlanta, Not City, Port Wentworth · test 2/14 6:36 tEST 5/15