PERMITREPORTER GEORGIA

THE WIRECOBB → RECORD Nº 007370

ROADS · DEC 23 2024 · COBB COUNTY

Road project 0019616: BIG SHANTY RD FROM CHASTAIN MEADOWS PKWY TO BELLS FERRY RD

Construction Work Program · Widening · Cities: Not City · Funding: NEPA · This project proposes to widen the existing one-lane each direction undivided section of Big Shanty Rd from Chastain Meadows Pkwy to Bells Ferry Rd to a two lane each direction raised median divided roadway. The intersection of Big Shanty Rd and Chastain Meadows Pkwy will be reconstructed as a multilane roundabout to address current and future traffic demands. The intersection of Big Shanty Rd and Bells Ferry Rd will be reconstructed into a single lane roundabout with bypass lanes. The widening of Big Shanty Rd will occur to the northern side of the roadway which will allow for the retention of the recently constructed sidewalk to the south side of Big Shanty Rd and minimize impacts to the existing utilities to the greatest extent possible. The project will be 0.46 miles in length and is located within the Town Center CID.

NEARBY ON THE RECORD · Cobb County

  1. ROADS JUL 10 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project S016266: SR 360/MACLAND RD @ GUS ROBINSON RD INSTALL RCUT

    Construction Work Program · RCUT · Routes: 0000 · Cities: Not City · SR 360/MACLAND RD @ GUS ROBINSON RD INSTALL RCUT

  2. ROADS JUL 06 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006967: I-285 @ 5 LOCS IN COBB & FULTON COUNTY - BRIDGE PREVENTATIVE

    Construction Work Program · Bridges · Routes: 0000 · Cities: Atlanta, East Point, Not City, South Fulton · The work consist of LMC deck overlay, joint replacement, painting the steel superstructure, spall/delamination re…

  3. ROADS JUN 26 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0019207: POWDER SPRINGS SILVER COMET TRAIL CONNECTOR - LCI

    Construction Work Program · Shared Use Path · Routes: 0000 · Cities: Powder Springs · Funding: NEPA · Located in the City of Powder Springs, the project begins at Pineview Drive Southwest running along Jackson Way as wel…

  4. ROADS JUN 17 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006906: SR 92 FROM E OF MABRY ROAD/COBB TO W OF SR 9/FULTON

    Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Not City, Roswell · Funding: NEPA · SR 92 FROM E OF MABRY ROAD/COBB TO W OF SR 9/FULTON

  5. ROADS MAY 15 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0021701: RAILROAD WARNING DEVICES @ 3 GNRR LOCS IN CHEROKEE & COBB

    Construction Work Program · RRX Warning Device · Routes: 0000 · Cities: Not City, Woodstock · RAILROAD WARNING DEVICES @ 3 GNRR LOCS IN CHEROKEE & COBB

  6. ROADS MAY 13 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M007023: SR 92 FROM CHEROKEE COUNTY LINE TO FULTON COUNTY LINE

    Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Not City · SR 92 FROM CHEROKEE COUNTY LINE TO FULTON COUNTY LINE