PERMITREPORTER GEORGIA

THE WIRECOBB → DOSSIER Nº 007505

ROADS · COMPILED RECORD REPORT

Road project 0021182: SR 5 SPUR @ SANDY PLAINS ROAD

Construction Work Program · Operational Improvement · Cities: Marietta, Not City · The proposed improvement would provide dual right turn lanes approximately 485 ft in length on SR 5 for the eastbound approach. The additional right turn lane would require widening along the south side of the eastbound approach. The eastbound right turn angle would also be improved to provide a safer right turning radius onto Sandy Plains Road from SR 5/Canton Rd Conn. The safer right turn angle will require vehicles to slow down and improve driver visibility of pedestrians and other motorists. Upon completion, the dual eastbound right turn lanes would require adjustments to the existing island, signal and utility poles and signal cabinet in the southwest quadrant of the intersection. Providing dual right turn lanes on the eastbound approach will significantly reduce the queuing and spillback observed in both the AM and PM peak periods.

Record date
Mar 6, 2025
County
Cobb County
Freshness
LIVE · THROUGH JUL 10, 2026
Official source
Georgia DOT Project Hub

06 · COUNTY PULSE

Cobb County pulse

PermitReporter tracks the Cobb Accela permits-dashboard ArcGIS layers on a daily cadence; records are collected through Jul 10, 2026.

Road Projects

4 latest 30 days

The latest 30-day window through Jul 10, 2026 contains 4 collected road projects; down 50% from the preceding 30-day window.

Permits

68 latest 30 days

The latest 30-day window through Jul 10, 2026 contains 68 collected permits; down 30% from the preceding 30-day window.

Coverage route: Cobb Accela permits-dashboard ArcGIS layers ↗