ROADS · MAR 13 2025 · FULTON COUNTY

Road project 0021209: ROBERTS DRIVE FM DUNWOODY PLACE TO SUMMER CROSSING - PHASE I

Construction Work Program · Preliminary Engineering · Cities: Sandy Springs · Located in the City of Sandy Springs along Roberts Drive, beginning at Dunwoody Place and ending at Island Ford Parkway (programmed to end at Summer Crossings). The project would build a 12-foot-wide shared use path with a 5-foot-wide landscaped buffer and a minimum of 1 foot back of path buffer on the south/east side of Roberts Drive. The project is approximately 0.6 miles. Other elements include street trees; midblock pedestrian crossings at Pride Place & at Island Ford Park; pedestrian lighting. The project crosses US19/SR400 utilizing an existing traffic bridge (PI 0001757).

NEARBY ON THE RECORD · Fulton County

  1. ROADS JAN 01 2028 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 15)

    Project type: Bridge Replacement. Construction year stated: 2028.

  2. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 1)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  3. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 12)

    Project type: Bridge Replacement. Construction year stated: 2027.

  4. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 13)

    Project type: Bridge Replacement. Construction year stated: 2027.

  5. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 14)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  6. ROADS JUL 15 2026 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006940: Test Project Created to Validate TPRO v06.01.02

    Construction Work Program · Preliminary Engineering · Routes: 0000 · Cities: Atlanta, Not City, Port Wentworth · test 2/14 6:36 tEST 5/15