PERMITREPORTER GEORGIA

THE WIREFULTON → RECORD Nº 007573

ROADS · APR 03 2025 · FULTON COUNTY

Road project 721000-: SR 120 FROM JONES CREEK COMMONS TO S OF BOLES ROAD

Construction Work Program · Widening · Cities: Johns Creek · Funding: NEPA · The proposed project would widen SR 120/Abbotts Bridge Rd from SR 141/Medlock Bridge Rd to Peachtree Industrial Blvd from two to four through lanes. The total project length is approx. 2.5 mi, which includes a 1500’ tie-in to SR 120 west of SR 141 and a 1000’ tie-in east of Peachtree Industrial Blvd. Both SR 141 & Peachtree Industrial Blvd would be improved & widened for approx. 1000’ in each direction approaching SR 120. Parsons Rd would also be improved & widened for 1250’ south of SR 120 & Boles Rd would be improved for 1000’ north of SR 120. All other side roads would be improved to a maximum of 500’ from SR 120. The existing SR 120 bridge would be widened and/or reconstructed across the Chattahoochee River. All signalized intersections would be modified. Existing ROW within the project corridor are approx. 60' to 130'. Proposed ROW would be approx. 104' to 140'.

NEARBY ON THE RECORD · Fulton County

  1. ROADS JAN 01 2028 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 15)

    Project type: Bridge Replacement. Construction year stated: 2028.

  2. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 1)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  3. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 12)

    Project type: Bridge Replacement. Construction year stated: 2027.

  4. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 13)

    Project type: Bridge Replacement. Construction year stated: 2027.

  5. ROADS JAN 01 2027 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Intersection/Operational Improvement (map feature 14)

    Project type: Intersection/Operational Improvement. Construction year stated: 2027.

  6. ROADS JUL 15 2026 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006940: Test Project Created to Validate TPRO v06.01.02

    Construction Work Program · Preliminary Engineering · Routes: 0000 · Cities: Atlanta, Not City, Port Wentworth · test 2/14 6:36 tEST 5/15