THE WIRE → FULTON → RECORD Nº 007577
ROADS · JUL 12 2017 · FULTON COUNTY
Road project 721850-: SR 400 CD LN FROM HAMMOND DR TO PITTS RD;INC ABERNATHY INTCH
Under Construction · Interchange · Cities: Sandy Springs · Funding: NEPA · The project adds two Collector Distributor lanes (plus auxiliary lanes) on SR 400 NB and SB from I-285 to Spalding Drive. The existing north facing ramps at the Hammond Drive Half Diamond interchange will be modified to access the proposed CD lanes. The project will reconstruct the Abernathy Road interchange and will be designed not to preclude construction of managed lanes on SR 400 in the future.