Road project 731865-: SR 92 @ PROCTOR CREEK/LAKE ACWORTH IN SW ACWORTH

Under Construction · Bridges · Cities: Not City · Funding: GEPA · The project proposes to widen SR 92/Lake Acworth Drive from US 41/SR 3/Cobb Parkway to Glade Road to a divided 4-lane facility with 11-foot lanes on the inside and 12-foot lanes on the outside, a raised concrete median varying from 8 to 20 feet in width, 16-foot shoulder with curb and gutter and a 10-foot multi-use trail on the east side of the roadway, 12-foot shoulder with curb and gutter and 5-foot sidewalk on the west side of the roadway. Within P.I. 0006862 there is a separate bridge replacement project P.I. 731865 over Lake Acworth. Lake Acworth will be spanned by a bridge approximately 1500-feet in length on new location. The proposed right-of-way varies from 100 to 135 feet. Total length of the project is approximately 2.8 miles.

NEARBY ON THE RECORD · Cobb County

  1. ROADS JUL 10 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project S016266: SR 360/MACLAND RD @ GUS ROBINSON RD INSTALL RCUT

    Construction Work Program · RCUT · Routes: 0000 · Cities: Not City · SR 360/MACLAND RD @ GUS ROBINSON RD INSTALL RCUT

  2. ROADS JUL 06 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006967: I-285 @ 5 LOCS IN COBB & FULTON COUNTY - BRIDGE PREVENTATIVE

    Construction Work Program · Bridges · Routes: 0000 · Cities: Atlanta, East Point, Not City, South Fulton · The work consist of LMC deck overlay, joint replacement, painting the steel superstructure, spall/delamination re…

  3. ROADS JUN 26 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0019207: POWDER SPRINGS SILVER COMET TRAIL CONNECTOR - LCI

    Construction Work Program · Shared Use Path · Routes: 0000 · Cities: Powder Springs · Funding: NEPA · Located in the City of Powder Springs, the project begins at Pineview Drive Southwest running along Jackson Way as wel…

  4. ROADS JUN 17 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006906: SR 92 FROM E OF MABRY ROAD/COBB TO W OF SR 9/FULTON

    Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Not City, Roswell · Funding: NEPA · SR 92 FROM E OF MABRY ROAD/COBB TO W OF SR 9/FULTON

  5. ROADS MAY 15 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0021701: RAILROAD WARNING DEVICES @ 3 GNRR LOCS IN CHEROKEE & COBB

    Construction Work Program · RRX Warning Device · Routes: 0000 · Cities: Not City, Woodstock · RAILROAD WARNING DEVICES @ 3 GNRR LOCS IN CHEROKEE & COBB

  6. ROADS MAY 13 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M007023: SR 92 FROM CHEROKEE COUNTY LINE TO FULTON COUNTY LINE