Latest cited records
Road project Wire
Record date order · page 38
21 records in this page view
-
-
-
-
-
-
-
-
-
-
-
Sandy Springs capital project: High Point Road Project and Winfield Glen Drive Design (High Point Road Project and Winfield Glen Drive Design)
Phase: DESIGN. Project type: Stormwater.
-
Sandy Springs capital project: Heritage Museum (Heritage Museum)
Phase: DESIGN. Project type: Facilities.
-
Sandy Springs capital project: Abernathy Road Shared-Use Path built with Transform 285/400 (Abernathy Road Shared-Use Path built with Transform 285/400)
Phase: CST. Project type: Shared-Use Path. The reconstruction on Abernathy Road will include a 10 ft Shared-Use Path. The interesection will be modifed to be a DDI.
-
Sandy Springs capital project: 8975 Roswell Road (8975 Roswell Road)
Phase: CST. Project type: Stormwater.
-
Sandy Springs capital project: 6880 Riverside Drive (6880 Riverside Drive)
Phase: CST. Project type: Stormwater. The project site is located at the intersection of the Riverside Drive and Johnson Ferry Road NW.
-
Sandy Springs capital project: 6445 Powers Ferry Road (6445 Powers Ferry Road)
Phase: CST. Project type: Stormwater.
-
Sandy Springs capital project: 5760 Mountain Creek Road Phase II (5760 Mountain Creek Road Phase II)
Phase: CST. Project type: Stormwater.
-
Sandy Springs capital project: 4980 Roswell Rd (4980 Roswell Rd)
Phase: DESIGN. Project type: Stormwater.
-
Sandy Springs capital project: 2015 Spalding Drive (2015 Spalding Drive)
Phase: DESIGN. Project type: Stormwater.
-
Sandy Springs capital project: 1720 Winterthur Close (1720 Winterthur Close)
Phase: DESIGN. Project type: Stormwater.
-
Sandy Springs capital project: 1560 Huntingdon Trail (1560 Huntingdon Trail)
Phase: DESIGN. Project type: Stormwater.