PERMITREPORTER GEORGIA

ALL 159 GEORGIA COUNTIES · FRESHNESS NOTATED

Georgia ground,
on the record.

Foreclosure notices, building permits, rezonings and recorded sales — pulled straight from the public record and cited to the source. If something is moving on the ground near you, it’s on the wire.

16,011records on file
159counties covered
JUL 18 2026last collection
STATEWIDE COUNTY DIRECTORY · 159 counties; the seven-sheet map remains above
Appling 2 Atkinson 3 Bacon 1 Baker 5 Baldwin 5 Banks 3 Barrow 2 Bartow 47 Ben Hill 4 Berrien 7 Bibb 738 Bleckley Brantley 6 Brooks 4 Bryan 7 Bulloch 16 Burke 16 Butts 14 Calhoun 4 Camden 3 Candler 8 Carroll 60 Catoosa 19 Charlton 5 Chatham 847 Chattahoochee Chattooga 34 Cherokee 537 Clarke 11 Clay 3 Clayton 8 Clinch Cobb 7,080 Coffee 12 Colquitt 9 Columbia 8 Cook 6 Coweta 48 Crawford 4 Crisp 3 Dade 7 Dawson 161 DeKalb 1,248 Decatur 8 Dodge Dooly 4 Dougherty 12 Douglas 62 Early 10 Echols 2 Effingham 4 Elbert 6 Emanuel 3 Evans 5 Fannin 2 Fayette 26 Floyd 6 Forsyth 793 Franklin 6 Fulton 1,989 Gilmer 6 Glascock Glynn 4 Gordon 5 Grady 19 Greene 2 Gwinnett 815 Habersham 7 Hall 372 Hancock 3 Haralson 10 Harris 4 Hart 5 Heard 11 Henry 22 Houston 5 Irwin 7 Jackson 13 Jasper 2 Jeff Davis 1 Jefferson Jenkins 1 Johnson 6 Jones 3 Lamar 4 Lanier Laurens 8 Lee 9 Liberty 6 Lincoln 3 Long 3 Lowndes 12 Lumpkin 6 Macon 2 Madison 6 Marion 1 McDuffie 5 McIntosh 1 Meriwether 5 Miller 5 Mitchell 12 Monroe 20 Montgomery Morgan 17 Murray 13 Muscogee 6 Newton 5 Oconee Oglethorpe Paulding 28 Peach 3 Pickens 21 Pierce 4 Pike 23 Polk 26 Pulaski Putnam 3 Quitman 1 Rabun 5 Randolph 3 Richmond 6 Rockdale 10 Schley 1 Screven 8 Seminole 10 Spalding 37 Stephens 5 Stewart 2 Sumter 2 Talbot 7 Taliaferro 2 Tattnall 5 Taylor 4 Telfair Terrell 3 Thomas 22 Tift 13 Toombs 2 Towns Treutlen Troup 56 Turner 5 Twiggs 7 Union 3 Upson 16 Walker 16 Walton 29 Ware 1 Warren Washington 6 Wayne 4 Webster 2 Wheeler White 7 Whitfield 19 Wilcox Wilkes 1 Wilkinson Worth 19
All records Tax sale & excess funds 3065 Recorded sale 3161 Permit 5021 Rezoning case 623 County meeting 123 Land clearing 441 Road project 1795 New business 118 Storm event 1482 Court opinion 155 Code enforcement 27 Foreclosure notices COMING SOON

THE WIRE · Road project

  1. ROADS AUG 05 2025 · GWINNETT · GEORGIA DOT PROJECT HUB

    Road project 0017998: SR 124 FROM OLD PEACHTREE ROAD TO MT MORIAH ROAD - PHASE I

    Construction Work Program · ITS · Cities: Not City · Funding: NEPA · This project proposes an ITS improvement along SR 124 From SR 20 to the Barrow County Line in Gwinnett County. This project is phase I of II, project 0…

  2. ROADS AUG 05 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0004634: MCGINNIS FERRY ROAD FROM DOUGLAS ROAD TO HOSPITAL PKWY-PH I

    Under Construction · Widening · Cities: Johns Creek, Not City · Funding: GEPA · The proposed project would consist of the widening of McGinnis Ferry Road from Seven Oaks Parkway terminating approximately 1000 feet east o…

  3. ROADS AUG 05 2025 · FORSYTH · GEORGIA DOT PROJECT HUB

    Road project 0004634: MCGINNIS FERRY ROAD FROM DOUGLAS ROAD TO HOSPITAL PKWY-PH I

    Under Construction · Widening · Cities: Johns Creek, Not City · Funding: GEPA · The proposed project would consist of the widening of McGinnis Ferry Road from Seven Oaks Parkway terminating approximately 1000 feet east o…

  4. ROADS AUG 04 2025 · HALL · GEORGIA DOT PROJECT HUB

    Road project M006814: SR 52 FROM SKITTS MOUNTAIN ROAD TO JILIAN BAUGH ROAD

    Under Construction · Resurface & Maintenance · Cities: Lula, Not City · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 52 to improve the roadways current low OCI score…

  5. ROADS JUL 30 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006558: SR 14 FROM SR 14 ALT TO NORMAN BERRY DRIVE

    Under Construction · Resurface & Maintenance · Cities: College Park, East Point, South Fulton · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 14 to improve the roadwa…

  6. ROADS JUL 22 2025 · HALL · GEORGIA DOT PROJECT HUB

    Road project M006806: I-985 FROM I-85/GWINNETT TO SR 369/HALL

    Construction Work Program · Concrete Rehab · Cities: Buford, Flowery Branch, Gainesville, Not City, Oakwood · I-985 FROM I-85/GWINNETT TO SR 369/HALL

  7. ROADS JUL 22 2025 · GWINNETT · GEORGIA DOT PROJECT HUB

    Road project M006806: I-985 FROM I-85/GWINNETT TO SR 369/HALL

    Construction Work Program · Concrete Rehab · Cities: Buford, Flowery Branch, Gainesville, Not City, Oakwood · I-985 FROM I-85/GWINNETT TO SR 369/HALL

  8. ROADS JUL 21 2025 · GWINNETT · GEORGIA DOT PROJECT HUB

    Road project M006810: I-85 FROM N OF I-985 TO JACKSON COUNTY LINE

    Construction Work Program · Resurface & Maintenance · Cities: Braselton, Not City · I-85 FROM N OF I-985 TO JACKSON COUNTY LINE

  9. ROADS JUL 18 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006805: I-85 FROM MERIWETHER COUNTY LINE TO SR 74

    Construction Work Program · Concrete Preservation · Cities: Fairburn, Grantville, Newnan, Not City, Palmetto · I-85 FROM MERIWETHER COUNTY LINE TO SR 74

  10. ROADS JUL 17 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0021302: POWDER SPRINGS DALLAS ROAD CORRIDOR CROSSING CLOSURE STUDY

    Construction Work Program · Special Studies · Cities: Not City, Powder Springs · POWDER SPRINGS DALLAS ROAD CORRIDOR CROSSING CLOSURE STUDY

  11. ROADS JUL 08 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project S016154: Install RCUT & U-Turn on SR 70 @ Rivertown Rd

    Under Construction · RCUT · Cities: Chattahoochee Hills, South Fulton · Install RCUT & U-Turn on SR 70 @ Rivertown Rd

  12. ROADS JUN 20 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0017135: I-285 WB FM HENDERSON TO NORTHSIDE DR;INC SR 400-EXPRESS LN

    Construction Work Program · Managed Lanes · Cities: Doraville, Dunwoody, Not City, Sandy Springs, Tucker · Funding: NEPA · This project will construct two Express Lanes in each direction on I-285 from the North Springs M…

  13. ROADS JUN 18 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021192: BUFORD SPRING CONNECTOR @ I-85 - TUNNEL LIGHTING

    Under Construction · Lighting · Cities: Atlanta · Funding: NEPA · The purpose of this project is to upgrade the existing tunnel lighting from HPS to energy-efficient LED fixtures. Scope of work may also include replaceme…

  14. ROADS JUN 12 2025 · GWINNETT · GEORGIA DOT PROJECT HUB

    Road project S016180: SR 13 @ Lee St - Install Dual SB Left Turn Lanes

    Under Construction · UNKNOWN · Cities: Buford · SR 13 @ Lee St - Install Dual SB Left Turn Lanes

  15. ROADS JUN 05 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021298: PEACHTREE STREET FROM NORTH AVE TO W PEACHTREE STREET

    Construction Work Program · Roadway Project · Cities: Atlanta · Funding: NEPA · Located in the City of Atlanta, the project is along Peachtree Street beginning at North Avenue and ending at West Peachtree Street. The pro…

  16. ROADS JUN 05 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0019617: CHATTAHOOCHEE RIVER TRAIL FM SR 139 TO NICKAJACK CREEK-PH II

    Construction Work Program · Shared Use Path · Cities: Mableton, Not City · Funding: NEPA · The project will construct 6, 10 and 16-foot wide shared use paths with intermittent modal separation. A bridge is proposed over …

  17. ROADS JUN 03 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021310: I-20 FROM CAPITOL AVE TO FLAT SHOALS ROAD - LIGHTING

    Under Construction · Lighting · Cities: Atlanta, Not City · Funding: NEPA · The purpose of this project is to upgrade the existing lighting systems, along this corridor, from HPS to energy-efficient LED fixtures. Scope o…

  18. ROADS JUN 03 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021309: I-20 FROM LINKWOOD ROAD TO I-85 - LIGHTING

    Under Construction · Lighting · Cities: Atlanta · Funding: NEPA · The purpose of this project is to upgrade the existing lighting systems, along this corridor, from HPS to energy-efficient LED fixtures. Scope of work may…

  19. ROADS JUN 03 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021308: I-85 FROM I-75 TO N OF LENOX ROAD - LIGHTING

    Under Construction · Lighting · Cities: Atlanta · Funding: NEPA · The purpose of this project is to upgrade the existing lighting systems, along this corridor, from HPS to energy-efficient LED fixtures. Scope of work may…

  20. ROADS JUN 03 2025 · FORSYTH · GEORGIA DOT PROJECT HUB

    Road project 0021305: OFF-SYSTEM SAFETY IMPROVEMENTS @ 3 LOCS IN FORSYTH COUNTY

    Construction Work Program · Sharp Curve Treatments · Cities: Not City · Funding: NEPA · The project consists of sharp curve treatments, rumble strips, and updating signs and striping on various roads in Forsyth County.

  21. ROADS JUN 02 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006786: SR 92 FROM PAULDING COUNTY LINE TO SR 3

    Construction Work Program · Resurface & Maintenance · Cities: Not City · SR 92 FROM PAULDING COUNTY LINE TO SR 3

  22. ROADS JUN 02 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006784: SR 166 FROM W OF SYLVAN ROAD TO LAKEWOOD AVE

    Construction Work Program · Resurface & Maintenance · Cities: Atlanta · Funding: NEPA · SR 166 FROM W OF SYLVAN ROAD TO LAKEWOOD AVE

  23. ROADS JUN 02 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006783: SR 6 FROM BUTNER ROAD TO I-85

    Construction Work Program · Resurface & Maintenance · Cities: Atlanta, College Park, East Point, South Fulton · Funding: NEPA · SR 6 FROM BUTNER ROAD TO I-85

  24. ROADS JUN 02 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021299: MARIETTA BLVD FROM SR 8 TO CORONET WAY

    Construction Work Program · Roadway Project · Cities: Atlanta · Funding: NEPA · Located in City of Atlanta, the project is along Marietta Boulevard beginning at State Route 8/Donald Lee Hollowell Parkway and ending at Co…

  25. ROADS MAY 30 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006780: SR 120 FROM SAINT LILY PLACE TO FULTON COUNTY LINE

    Construction Work Program · Resurface & Maintenance · Cities: Not City · SR 120 FROM SAINT LILY PLACE TO FULTON COUNTY LINE

  26. ROADS MAY 30 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006778: SR 6 FROM PAULDING COUNTY LINE TO POWDER SPRINGS DALLAS ROAD

    Construction Work Program · Resurface & Maintenance · Cities: Powder Springs · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 6 to improve the roadways current low OCI…

  27. ROADS MAY 30 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0017806: CUMBERLAND CORE LOOP FM GALLERIA DRIVE TO AKERS MILL RD-LCI

    Construction Work Program · Shared Use Path · Cities: Not City · Funding: NEPA · Approximately 0.4 miles of the Cumberland Sweep Trail Project, this project will provide pedestrian and micro-mobility connectivity from th…

  28. ROADS MAY 22 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project S016171: SR 372 & Green Rd -Install Temporary Signal & Ped. Facil

    Under Construction · Pedestrian Facilities · Cities: Alpharetta · SR 372 & Green Rd -Install Temporary Signal & Ped. Facil

  29. ROADS MAY 19 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project T009359: FY 2030 FTA SECTION 5329 STATE SAFETY OVERSIGHT

    Construction Work Program · Rail Projects · FY 2030 FTA SECTION 5329 STATE SAFETY OVERSIGHT

  30. ROADS MAY 19 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project T009358: FY 2029 FTA SECTION 5329 STATE SAFETY OVERSIGHT

    Construction Work Program · Rail Projects · FY 2029 FTA SECTION 5329 STATE SAFETY OVERSIGHT

  31. ROADS MAY 19 2025 · HALL · GEORGIA DOT PROJECT HUB

    Road project M006776: SR 11 & SR 124 @ 2 LOCS - BRIDGE PREVENTATIVE

    Construction Work Program · Bridges · Cities: Gainesville, Lawrenceville · Funding: NEPA · Bridge Preventative Maintenance. The work will consist of deck preservation, replacement of edge beams, joint replacement, spall …

  32. ROADS MAY 19 2025 · GWINNETT · GEORGIA DOT PROJECT HUB

    Road project M006776: SR 11 & SR 124 @ 2 LOCS - BRIDGE PREVENTATIVE

    Construction Work Program · Bridges · Cities: Gainesville, Lawrenceville · Funding: NEPA · Bridge Preventative Maintenance. The work will consist of deck preservation, replacement of edge beams, joint replacement, spall …

  33. ROADS MAY 15 2025 · DAWSON · GEORGIA DOT PROJECT HUB

    Road project T009353: FY 2030-DAWSON COUNTY-SEC.5311-OPERATIONS

    Construction Work Program · Rural Transit - Capital/Ops · FY 2030-DAWSON COUNTY-SEC.5311-OPERATIONS

  34. ROADS MAY 15 2025 · DAWSON · GEORGIA DOT PROJECT HUB

    Road project T009351: FY 2029-DAWSON COUNTY-SEC.5311-OPERATIONS

    Construction Work Program · Rural Transit - Capital/Ops · FY 2029-DAWSON COUNTY-SEC.5311-OPERATIONS

  35. ROADS MAY 15 2025 · HALL · GEORGIA DOT PROJECT HUB

    Road project T009344: FY 2030-GAINESVILLE-SEC.5307-CAPITAL AND OPERATIONS

    Construction Work Program · Urban Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2030 for Gainesville.

  36. ROADS MAY 15 2025 · HALL · GEORGIA DOT PROJECT HUB

    Road project T009343: FY 2029-GAINESVILLE-SEC.5307-CAPITAL AND OPERATIONS

    Construction Work Program · Urban Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2029 for Gainesville.

  37. ROADS MAY 15 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006775: SR 70/SR 154 FROM SOUTH FULTON PKWY TO SR 92

    Construction Work Program · Resurface & Maintenance · Cities: Chattahoochee Hills, South Fulton · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 70/SR 154 to improve t…

  38. ROADS MAY 15 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006774: SR 120 FROM JOHN WARD ROAD TO SR 5

    Under Construction · Resurface & Maintenance · Cities: Marietta, Not City · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 120 to improve the roadways current low OCI …

  39. ROADS MAY 15 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006773: SR 9 FROM SR 141 TO ABERNATHY ROAD

    Construction Work Program · Resurface & Maintenance · Cities: Atlanta, Sandy Springs · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 9 to improve the roadways current…

  40. ROADS MAY 15 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006772: SR 8/US 278 FROM COBB COUNTY LINE TO SR 280

    Under Construction · Resurface & Maintenance · Cities: Atlanta · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 8/US 278 to improve the roadways current low OCI score.

  41. ROADS MAY 14 2025 · CHEROKEE · GEORGIA DOT PROJECT HUB

    Road project T009323: FY 2030-CHEROKEE COUNTY-SEC.5311-CAPITAL AND OPERATIONS

    Construction Work Program · Rural Transit - Capital/Ops · FY 2030-CHEROKEE COUNTY-SEC.5311-CAPITAL AND OPERATIONS

  42. ROADS MAY 14 2025 · CHEROKEE · GEORGIA DOT PROJECT HUB

    Road project T009322: FY 2029-CHEROKEE COUNTY-SEC.5311-CAPITAL AND OPERATIONS

    Construction Work Program · Rural Transit - Capital/Ops · FY 2029-CHEROKEE COUNTY-SEC.5311-CAPITAL AND OPERATIONS

  43. ROADS MAY 14 2025 · HALL · GEORGIA DOT PROJECT HUB

    Road project S016169: Install Left Turn Lane on SR 53 EB @ Sardis Rd

    Under Construction · Turn Lanes · Cities: Not City · Install Left Turn Lane on SR 53 EB @ Sardis Rd

  44. ROADS MAY 09 2025 · HALL · GEORGIA DOT PROJECT HUB

    Road project T009234: GAINESVILLE - REPLACE TAXIWAY LIGHTING

    Construction Work Program · Airport · Cities: Gainesville · GAINESVILLE - REPLACE TAXIWAY LIGHTING

  45. ROADS MAY 05 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006771: I-75/I-85 @ PRYOR STREET - BRIDGE PREVENTATIVE

    Construction Work Program · Bridges · Cities: Atlanta · Funding: NEPA · Bridge Rehabilitation for 121-0056-0. The work will consist of bridge deck header reconstruction, replacement of bearings, polymer overlay of the br…

  46. ROADS MAY 05 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021273: SR 9 FROM WINDWARD PKWY TO FORSYTH COUNTY LINE

    Construction Work Program · Widening · Cities: Alpharetta, Milton · Funding: GEPA · SR 9 FM WINDWARD PARKWAY TO FORSYTH COUNTY LINE

  47. ROADS MAY 02 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006768: I-85 & I-285 @ 3 LOCS IN FULTON COUNTY - BRIDGE PREVENTATIVE

    Construction Work Program · Bridges · Cities: Atlanta · Funding: NEPA · Bridge Rehabilitation. The work will consist of deck rehabilitation, replacement of edge beams, joint replacement, painting the steel beams, spall r…

  48. ROADS MAY 02 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006767: I-75 & I-285 @ 4 LOCS IN COBB COUNTY - BRIDGE PREVENTATIVE

    Construction Work Program · Bridges · Cities: Kennesaw, Marietta, Not City · Funding: NEPA · Bridge Rehabilitation. The work will consist of deck rehabilitation, replacement of edge beams, joint replacement, painting the…