Authorized housing units
171 units May 2026 · monthly U.S. Census Bureau Building Permits SurveyCounty pulse · public-record coverage
Hall County
County seat: Gainesville. 89,484 parcels on the county roll. 1,538 subdivisions indexed for search.
Parcel count is the 2026-07-14 public parcel_owner ArcGIS row count, not a cadastral polygon count. Meeting coverage is City of Gainesville CivicClerk, not all Hall County bodies. Hall GIS license language restricts distribution outside the licensee organization.
Latest cited county indicators
Census permit baseline
One monthly Census Building Permits Survey observation is on file. A direction-of-change trend is not shown until another comparable month is collected.
Stated construction value
$57,367,059 May 2026 · monthly U.S. Census Bureau Building Permits SurveyHouse-price change
+2.30% 2025 · year over year Federal Housing Finance Agency HPIMortgages originated
4,340 originations 2024 · annual CFPB/FFIEC HMDASource availability
What Hall makes public
Other collected public records
Hall County Wire
The records below may include statewide infrastructure or hazard sources; they are not a county permit feed.
-
Road project 0009679: SPOUT SPRINGS ROAD FROM I-985 TO UNION CIRCLE - PHASE I
Under Construction · Widening · Cities: Flowery Branch, Not City · Funding: NEPA · Project P.I. no. 0009679 proposes to widen CR 1287 / Spout Springs Road from a 2-lane roadway to a 4-lane divided roadway with a 20 foot raised median and sidewalks. Median open…
-
Road project 0007170: SR 136 @ CHESTATEE RIVER 8.3 MI SOUTHEAST OF DAWSONVILLE
Under Construction · Bridges · Cities: Not City · Funding: NEPA · The proposed project is to construct a 482 foot long bridge to replace the existing SR 136 bridge over the Chestatee River. The project proposes to realign the bridge to the south therefore traf…
-
Road project 0003626: SARDIS RD CONN FM SR 60 TO SARDIS RD NEAR CHESTATEE RD
Under Construction · Widening · Cities: Not City · Funding: GEPA · The SARDIS ROAD CONNECTOR is the widening and reconstruction of several existing local roads and streets with some new roadway on new alignment. This project STP-0003-00(626) begins at the Sard…
-
Road project 0013922: I-985 @ CS 991/ELACHEE ROAD IN GAINESVILLE
Under Construction · Bridges · Cities: Gainesville · Funding: NEPA · This project will replace the existing bridge that was built in 1967 over I-985 in Gainesville. The proposed bridge will be 250 feet long, consisting of two 13-foot lanes, a 2-foot gutter, an…
-
TAX SALE Hall
Excess funds held: parcel 01022 007006
Former owner listed: MAYS BRENDA. Purchaser: DEED CO, LLC.. Excess funds: $38,034.71. City: GAINESVILLE.
Stated value$38,035
436 SE FAIR STREET -
TAX SALE Hall
Excess funds held: parcel 15036D000129
Former owner listed: DEAN RICKEY ESTATE. Purchaser: ABEL VAZQUEZ. Excess funds: $1,911.26. City: GAINESVILLE.
Stated value$1,911
HOPE ROAD -
TAX SALE Hall
Excess funds held: parcel 15018 000007A
Former owner listed: SARGENT LUCILLE. Purchaser: DEMETRIO GOICOCHEA. Excess funds: $18,704.54. City: GAINESVILLE.
Stated value$18,705
4889 MILLER LAKE ROAD -
TAX SALE Hall
Excess funds held: parcel 15018 000169
Former owner listed: SARGENT LUCILLE. Purchaser: GUOHUA LIAN & DUAN RAN WANG. Excess funds: $9,460.77. City: GAINESVILLE.
Stated value$9,461
MILLER LAKE ROAD -
Road project T006773: GAINESVILLE – RUNWAY 23 SAFETY IMPROVEMENTS, PHASE 2
Construction Work Program · Airport · Cities: Gainesville · GAINESVILLE – RUNWAY 23 SAFETY IMPROVEMENTS, PHASE 2
-
Road project 0016084: GAINESVILLE HALL MPO JACKSON CTY TRANSP MASTER PLAN UPDATE
Under Construction · Preliminary Engineering · GAINESVILLE HALL MPO JACKSON CTY TRANSP MASTER PLAN UPDATE
-
Road project 0015848: GAINESVILLE HALL FRIENDSHIP ROAD AND HIGHLANDS TRAIL 2018
Under Construction · Preliminary Engineering · GAINESVILLE HALL FRIENDSHIP ROAD AND HIGHLANDS TRAIL 2018
-
TAX SALE Hall
Excess funds held: parcel 15044A003029
Former owner listed: BAGWELL DEV & CONST. Purchaser: HAYZELLEEI, LLC.. Excess funds: $219.62. City: FLOWERY BRANCH.
Stated value$220
3983 PAULINE DRIVE -
Road project T006569: GAINESVILLE - RUNWAY SAFETY IMPROVEMENTS, PHASE I
Construction Work Program · Airport · Cities: Gainesville · GAINESVILLE - RUNWAY SAFETY IMPROVEMENTS, PHASE I
-
Road project T006436: FY 2021-HALL COUNTY-SEC.5311-CAPITAL AND OPERATIONS
Construction Work Program · Rural Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2021 for Hall County.
-
Road project T006348: FY 2020-HALL COUNTY-SEC.5311-CAPITAL AND OPERATIONS
Construction Work Program · Rural Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2020 for Hall County.
-
Road project T006257: FY 2019-HALL COUNTY-SEC.5311-OPERATIONS ONLY
Construction Work Program · Rural Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2019 for Hall County.
-
Road project T006166: FY 2018-HALL COUNTY-SEC.5311-CAPITAL AND OPERATIONS
Construction Work Program · Rural Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2018 for Hall County.
-
Road project T006126: FY 2021-GAINESVILLE-SEC.5307-CAPITAL AND OPERATIONS
Construction Work Program · Urban Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2021 for the Gainesville urbanized area.
-
Road project T006115: FY 2020-GAINESVILLE-SEC.5307-CAPITAL AND OPERATIONS
Construction Work Program · Urban Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2020 for the Gainesville urbanized area.
-
Road project T006104: FY 2019-GAINESVILLE-SEC.5307-CAPITAL AND OPERATIONS
Construction Work Program · Urban Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2019 for the Gainesville urbanized area.
-
Road project T006089: FY 2021-GEORGIA MOUNTAINS RC-SEC.5304-PLANNING
Construction Work Program · MPO/Region Transit · This project will fund transit planning in FY 2021 for the Georgia Mountains Regional Commission.
-
Road project T006078: FY 2020-GEORGIA MOUNTAINS RC-SEC.5304-PLANNING
Construction Work Program · MPO/Region Transit · This project will fund transit planning in FY 2020 for the Georgia Mountains Regional Commission.
-
Road project T006066: FY 2019-GEORGIA MOUNTAINS RC-SEC.5304-PLANNING
Construction Work Program · MPO/Region Transit · This project will fund transit planning in FY 2019 for the Georgia Mountains Regional Commission.
-
Road project T006043: FY 2018-GAINESVILLE-SEC.5307-CAPITAL AND OPERATIONS
Construction Work Program · Urban Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2018 for the Gainesville urbanized area.
-
Road project T006016: FY 2021-GAINESVILLE MPO-SEC.5303-PLANNING
Construction Work Program · MPO/Region Transit · This project will fund transit planning in FY 2021 for the Gainesville MPO.
-
Road project T006004: FY 2020-GAINESVILLE MPO-SEC.5303-PLANNING
Construction Work Program · MPO/Region Transit · This project will fund transit planning for FY 2020 in the Gainesville MPO.
-
Road project T005993: FY 2019-GAINESVILLE MPO-SEC.5303-PLANNING
Construction Work Program · MPO/Region Transit · This project will fund transit planning in FY 2019 for the Gainesville MPO.
-
Road project T005485: FY 2017 FTA SECTION 5339 BUS AND BUS FACILITIES FOR HALL
Construction Work Program · Transit Projects · FY 2017 FTA SECTION 5339 BUS AND BUS FACILITIES FOR HALL
-
Road project T005458: FY 2017 SECTION 5307 CAPITAL FOR GAINESVILLE
Construction Work Program · Transit Projects · FY 2017 SECTION 5307 CAPITAL FOR GAINESVILLE
-
Road project T005457: FY 2017 SECTION 5307 OPERATING FOR GAINESVILLE
Construction Work Program · Transit Projects · FY 2017 SECTION 5307 OPERATING FOR GAINESVILLE
-
Road project T005454: FY 2017 SECTION 5311 CAPITAL FOR DOT DISTRICT 1
Construction Work Program · Transit Projects · FY 2017 SECTION 5311 CAPITAL FOR DOT DISTRICT 1
-
Road project T005451: FY 2016 FTA SECTION 5339 BUS AND BUS FACILITIES FOR HALL
Construction Work Program · Transit Projects · FY 2016 FTA SECTION 5339 BUS AND BUS FACILITIES FOR HALL
-
Road project T005135: FY 2018-GAINESVILLE MPO-SEC.5303-PLANNING
Construction Work Program · MPO/Region Transit · This project will fund transit planning in FY 2018 for the Gainesville MPO.
-
Road project T004848: FY 2017 FTA SECTION 5307/5340 FORMULA FUNDS FOR HALL
Construction Work Program · Transit Projects · Routes: 000000 · FY 2017 FTA SECTION 5307/5340 FORMULA FUNDS FOR HALL
-
Road project T004615: GA96X012 ARRA 5307 CAPITAL FOR HALL FY 2013
Construction Work Program · Transit Projects · Routes: 000000 · Cities: Gainesville · GA96X012 ARRA 5307 CAPITAL FOR HALL FY 2013
-
Road project T004545: ARRA - Rural Capital - Hall County - FY 2013
Construction Work Program · ARRA - Rural Capital - Hall County - FY 2013
-
Road project T004528: GAINESVILLE-TERMINAL AREA IMPROVEMENTS
Construction Work Program · Airport · Routes: 000000 · Cities: Gainesville · Project Number associated with PID: AP013-9016-31(139)
-
Road project T004523: GA18-X032 RURAL OPERATING HALL COUNTY FY12 SUPPLEMENTAL
Construction Work Program · Transit Projects · GA18-X032 RURAL OPERATING HALL COUNTY FY12 SUPPLEMENTAL
-
Road project T004482: GA-90-X309 - GAINESVILLE
Construction Work Program · Transit Projects · Routes: 000000 · GA-90-X309 - GAINESVILLE
-
Road project T004414: FY 2016 SECTION 5307 CAPITAL FOR GAINESVILLE
Construction Work Program · Transit Projects · Routes: 000000 · FY 2016 SECTION 5307 CAPITAL FOR GAINESVILLE
-
Road project T004413: FY 2016 SECTION 5307 OPERATING FOR GAINESVILLE
Construction Work Program · Transit Projects · Routes: 000000 · FY 2016 SECTION 5307 OPERATING FOR GAINESVILLE
-
Road project T004404: FY 2016 FTA SECTION 5307/5340 FORMULA FUNDS FOR HALL
Construction Work Program · Transit Projects · Routes: 000000 · FY 2016 FTA SECTION 5307/5340 FORMULA FUNDS FOR HALL
-
Road project T004200: GAINESVILLE - ENGINEERING DESIGN FOR TERMINAL AREA IMPROV
Under Construction · Airport · Routes: 000000 · Cities: Gainesville · PROJECT NUMBER ASSOCIATED WITH PID IS AP012-9013-30(139)
-
Road project T004112: FY 2015 SECTION 5310 CAPITAL FOR AUGUSTA
Construction Work Program · Transit Projects · Routes: 000000 · FY 2015 SECTION 5310 CAPITAL FOR AUGUSTA
-
Road project T004107: FY 2015 SECTION 5310 CAPITAL FOR GAINESVILLE
Construction Work Program · Transit Projects · Routes: 000000 · FY 2015 SECTION 5310 CAPITAL FOR GAINESVILLE
-
Road project T004106: FY 2015 SECTION 5307 CAPITAL FOR GAINESVILLE
Construction Work Program · Transit Projects · Routes: 000000 · FY 2015 SECTION 5307 CAPITAL FOR GAINESVILLE
-
Road project T004085: FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR HALL
Construction Work Program · Transit Projects · Routes: 000000 · FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR HALL
-
Road project T004046: CY 2012 Gainesville/Hall MPO Planning
Construction Work Program · Transit Projects · Cities: Gainesville · CY 2012 Gainesville/Hall MPO Planning
Optional county watch
Watch Hall County.
Email begins only after confirmation and only when a newly collected record matches. Source cadence and lag still apply.