PERMITREPORTER GEORGIA

THE WIRECOBB → DOSSIER Nº 007421

ROADS · COMPILED RECORD REPORT

Road project 0020067: BELLS FERRY ROAD @ NOONDAY CREEK

Construction Work Program · Bridges · Cities: Not City · Funding: NEPA · The existing bridge along Bells Ferry Road over Noonday Creek would be replaced with a structure that meets current standards along with increased length and width to accommodate a third vehicular lane, future extension of the Noonday Creek Trail, and improved bridge hydraulics. The proposed bridge will be constructed roughly at the same elevation as the existing bridge. A new northbound left turn lane and southbound right turn lane would be added for improved access to the Noonday Creek Trailhead. The bridge height and bent locations will be designed to accommodate the future extension of the Noonday Creek Trail under the bridge.

Record date
Dec 23, 2024
County
Cobb County
Freshness
LIVE · THROUGH JUL 10, 2026
Official source
Georgia DOT Project Hub

06 · COUNTY PULSE

Cobb County pulse

PermitReporter tracks the Cobb Accela permits-dashboard ArcGIS layers on a daily cadence; records are collected through Jul 10, 2026.

Road Projects

4 latest 30 days

The latest 30-day window through Jul 10, 2026 contains 4 collected road projects; down 50% from the preceding 30-day window.

Permits

68 latest 30 days

The latest 30-day window through Jul 10, 2026 contains 68 collected permits; down 30% from the preceding 30-day window.

Coverage route: Cobb Accela permits-dashboard ArcGIS layers ↗