PERMITREPORTER GEORGIA

SHEET Nº 1 → COUNTY SHEET

COBB COUNTY

County seat: Marietta. 279,053 parcels on the county roll. 4,514 recorded subdivisions indexed for search.

Parcel count from 2026-07-13 GIS probe; ParcelSales layer supplies dated, stated-price records. Cobb's GIS distribution policy restricts reproduction outside the recipient organization; keep sale and GIS-derived reference rows internal pending written publication clearance.

building permits (units) 202 units 2026-05 · U.S. CENSUS BUREAU BUILDING PERMITS SURVEY · PER MONTH
permit valuation $36,840,990 2026-05 · U.S. CENSUS BUREAU BUILDING PERMITS SURVEY · PER MONTH
house-price change (yr) +2.10% 2025 · FEDERAL HOUSING FINANCE AGENCY HPI
mortgages originated 16,383 originations 2024 · CFPB/FFIEC HMDA · PER YEAR

WHAT COBB MAKES PUBLIC

Foreclosure notice source terms prohibit automated collection Tax sale & excess funds LIVE Recorded sale LIVE Permit LIVE Rezoning case LIVE County meeting LIVE Land clearing LIVE Road project LIVE New business no verified public business-license feed Storm event LIVE Flood map change FEMA robots.txt disallows /arcgis Court opinion LIVE New plat reference subdivisions only; no plat activity collector Code enforcement trial-court portal warns against automated mining Public notice LIVE

THE WIRE · Cobb County

  1. ROADS JUL 10 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project S016266: SR 360/MACLAND RD @ GUS ROBINSON RD INSTALL RCUT

    Construction Work Program · RCUT · Routes: 0000 · Cities: Not City · SR 360/MACLAND RD @ GUS ROBINSON RD INSTALL RCUT

  2. ROADS JUL 06 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006967: I-285 @ 5 LOCS IN COBB & FULTON COUNTY - BRIDGE PREVENTATIVE

    Construction Work Program · Bridges · Routes: 0000 · Cities: Atlanta, East Point, Not City, South Fulton · The work consist of LMC deck overlay, joint replacement, painting the steel superstructure, spall/delamination re…

  3. ROADS JUN 26 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0019207: POWDER SPRINGS SILVER COMET TRAIL CONNECTOR - LCI

    Construction Work Program · Shared Use Path · Routes: 0000 · Cities: Powder Springs · Funding: NEPA · Located in the City of Powder Springs, the project begins at Pineview Drive Southwest running along Jackson Way as wel…

  4. ROADS JUN 17 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006906: SR 92 FROM E OF MABRY ROAD/COBB TO W OF SR 9/FULTON

    Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Not City, Roswell · Funding: NEPA · SR 92 FROM E OF MABRY ROAD/COBB TO W OF SR 9/FULTON

  5. ROADS MAY 15 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0021701: RAILROAD WARNING DEVICES @ 3 GNRR LOCS IN CHEROKEE & COBB

    Construction Work Program · RRX Warning Device · Routes: 0000 · Cities: Not City, Woodstock · RAILROAD WARNING DEVICES @ 3 GNRR LOCS IN CHEROKEE & COBB

  6. ROADS MAY 13 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project T005050: ATLANTA-CONSTRUCT AIR TRAFFICE CONTROLL TOWER-MCCOLLUM FIELD

    Construction Work Program · Airport · Cities: Marietta · ATLANTA-CONSTRUCT AIR TRAFFICE CONTROLL TOWER-MCCOLLUM FIELD

  7. ROADS MAY 13 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M007027: SR 120 FROM SR 3 TO SR 3 CONN

    Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Marietta · SR 120 FROM SR 3 TO SR 3 CONN

  8. ROADS MAY 13 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M007023: SR 92 FROM CHEROKEE COUNTY LINE TO FULTON COUNTY LINE

    Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Not City · SR 92 FROM CHEROKEE COUNTY LINE TO FULTON COUNTY LINE

  9. ROADS MAY 12 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M007020: SR 280 FROM SR 5 TO I-75

    Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Fair Oaks, Marietta, Not City · SR 280 FROM SR 5 TO I-75

  10. ROADS MAY 12 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M007019: SR 3/US 41 FROM SR 120 ALT TO SR 5 CONN

    Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Marietta · SR 3/US 41 FROM SR 120 ALT TO SR 5 CONN

  11. ROADS MAY 12 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0020286: CUMBERLAND CORE LOOP FM E OF GALLERIA DR TO CUMBERLAND BLVD

    Construction Work Program · Shared Use Path · Routes: 0000 · Cities: Not City, Vinings · Funding: NEPA · This project proposes segment F of Cumberland Core Loop, a 3+ mile corridor with walking and biking paths and an au…

  12. ROADS MAY 12 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0019618: CUMBERLAND MULTI-MODAL PATH - SEGMENT E

    Construction Work Program · Shared Use Path · Routes: 0000 · Cities: Not City · Funding: NEPA · Cumberland Sweep Segment E: Approximately 0.6 mile of the Cumberland Sweep Trail project, PI-0019618 will provide pedestrian…

  13. ROADS MAY 07 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0021745: SR 3/US 41 @ ROTTENWOOD CREEK

    Construction Work Program · Culvert · Routes: 0000 · Cities: Marietta · The project involves a rehabilitation of the culvert located on SR 3/Cobb parkway @ Rottenwood Creek, Cobb County. The scope of this project is to r…

  14. ROADS MAY 04 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006534: I-75 & I-285 @ 2 LOCS IN COBB - BRIDGE PRESERVATION

    Construction Work Program · Bridges · Routes: 0000 · Cities: Not City · Funding: NEPA · The work involves Bridge Preservation – Polymer Overlay, Painting of the Superstructure, replacement of bridge joints, and vegetatio…

  15. ROADS APR 10 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project T009499: ATLANTA-RYY – A/F CS, REJUV, AND RE-MARK, REHAB TW A, PH 1

    Construction Work Program · Airport · Cities: Kennesaw · ATLANTA-RYY – A/F CS, REJUV, AND RE-MARK, REHAB TW A, PH 1

  16. ROADS MAR 26 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0019887: SR 3/US 41 @ THIRD ARMY ROAD & @ DABBS BRIDGE ROAD

    Construction Work Program · Roundabout · Routes: 0000 · Cities: Not City · Funding: NEPA · Intersection Improvement at Cobb Parkway (SR3/US41) at Black Acre Trail / Third Army Road. This project proposes to install two m…

  17. ROADS MAR 24 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project T005621: FY 2018 FTA SECTION 5307/5340 FORMULA FUNDS FOR RTC

    Construction Work Program · Transit Projects · FY 2018 FTA SECTION 5307/5340 FORMULA FUNDS FOR RTC

  18. ROADS FEB 09 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006936: SR 6 SPUR FROM SR 6 TO POWDER SPRINGS ROAD

    Construction Work Program · Resurface & Maintenance · Cities: Austell · Funding: NEPA · SR 6 SPUR FROM SR 6 TO POWDER SPRINGS ROAD

  19. ROADS FEB 09 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006933: SR 3/US 41 FROM TERRELL MILL ROAD TO SR 120

    Construction Work Program · Resurface & Maintenance · Cities: Marietta · Funding: NEPA · SR 3/US 41 FROM TERRELL MILL ROAD TO SR 120

  20. ROADS FEB 09 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006930: SR 120 ALT FROM SR 3 TO SR 120

    Construction Work Program · Resurface & Maintenance · Cities: Marietta · Funding: NEPA · SR 120 ALT FROM SR 3 TO SR 120

  21. ROADS JAN 23 2026 · COBB · GEORGIA DOT PROJECT HUB

    Road project S016219: SR 120 @ MT CALVARY RD AND BATTLEFIELD CREEK DR INSTALL RCUT

    Construction Work Program · RCUT · Cities: Not City · SR 120 @ MT CALVARY RD AND BATTLEFIELD CREEK DR INSTALL RCUT

  22. ROADS DEC 15 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0021581: SR 280 @ CHURCH ROAD/KENWOOD ROAD/OAKDALE ROAD

    Construction Work Program · Operational Improvement · Cities: Smyrna · SR 280 @ CHURCH ROAD/KENWOOD ROAD/OAKDALE ROAD

  23. ROADS DEC 10 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0013918: I-285 @ I-20 WEST SIDE INTERCHANGE RECONSTRUCTION & WIDENING

    Under Construction · Interchange · Cities: Atlanta, Mableton, Not City, South Fulton · Funding: NEPA · I-285 @ I-20 WEST SIDE INTERCHANGE RECONSTRUCTION & WIDENING

  24. ROADS NOV 26 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006909: SR 5 SPUR FROM I-75 TO S OF KURTZ ROAD

    Construction Work Program · Resurface & Maintenance · Cities: Marietta, Not City · SR 5 SPUR FROM I-75 TO S OF KURTZ ROAD

  25. ROADS NOV 24 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0021547: CHATTAHOOCHEE GREENWAY FROM SR 6 TO SR 139 - SCOPING ONLY

    Construction Work Program · Scoping · Cities: Mableton, Not City · The City of South Fulton Greenway is a key segment of ARC's Chattahoochee River Lands Greenway Plan, filling a critical gap between Douglas and Cobb Coun…

  26. ROADS NOV 20 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006911: SR 120 FROM WHITLOCK AVE TO SR 3

    Construction Work Program · Resurface & Maintenance · Cities: Marietta · SR 120 FROM WHITLOCK AVE TO SR 3

  27. ROADS SEP 19 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0020118: I-75 @ HOPE CREEK

    Construction Work Program · Drainage Improvements · Cities: Marietta · Funding: NEPA · This project proposes to repair the existing MSE wall and stormwater features that have been damaged due to scouring. The channel wil…

  28. ROADS SEP 10 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006562: I-75 FROM FREY ROAD/COBB TO GLADE ROAD/BARTOW

    Under Construction · Concrete Rehab · Cities: Kennesaw, Not City · Funding: NEPA · his project, selected by the District Maintenance Office, is the resurfacing of SR 401 to improve the roadways current low OCI score.

  29. ROADS SEP 02 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0018193: I-285 FROM SR 8 TO PACES FERRY ROAD

    Under Construction · Roadway Project · Cities: Atlanta, Not City, Vinings · Funding: NEPA · The purpose of this project is to replace the pavement that is in poor overall condition along I-285 west side from CS 843/Colli…

  30. ROADS AUG 07 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0021421: SR 6/US 278 @ FLORENCE ROAD

    Construction Work Program · Turn Lanes · Cities: Powder Springs · SR 6/US 278 @ FLORENCE ROAD

  31. ROADS JUL 17 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0021302: POWDER SPRINGS DALLAS ROAD CORRIDOR CROSSING CLOSURE STUDY

    Construction Work Program · Special Studies · Cities: Not City, Powder Springs · POWDER SPRINGS DALLAS ROAD CORRIDOR CROSSING CLOSURE STUDY

  32. ROADS JUN 05 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0019617: CHATTAHOOCHEE RIVER TRAIL FM SR 139 TO NICKAJACK CREEK-PH II

    Construction Work Program · Shared Use Path · Cities: Mableton, Not City · Funding: NEPA · The project will construct 6, 10 and 16-foot wide shared use paths with intermittent modal separation. A bridge is proposed over …

  33. ROADS JUN 02 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006786: SR 92 FROM PAULDING COUNTY LINE TO SR 3

    Construction Work Program · Resurface & Maintenance · Cities: Not City · SR 92 FROM PAULDING COUNTY LINE TO SR 3

  34. ROADS MAY 30 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006780: SR 120 FROM SAINT LILY PLACE TO FULTON COUNTY LINE

    Construction Work Program · Resurface & Maintenance · Cities: Not City · SR 120 FROM SAINT LILY PLACE TO FULTON COUNTY LINE

  35. ROADS MAY 30 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006778: SR 6 FROM PAULDING COUNTY LINE TO POWDER SPRINGS DALLAS ROAD

    Construction Work Program · Resurface & Maintenance · Cities: Powder Springs · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 6 to improve the roadways current low OCI…

  36. ROADS MAY 30 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0017806: CUMBERLAND CORE LOOP FM GALLERIA DRIVE TO AKERS MILL RD-LCI

    Construction Work Program · Shared Use Path · Cities: Not City · Funding: NEPA · Approximately 0.4 miles of the Cumberland Sweep Trail Project, this project will provide pedestrian and micro-mobility connectivity from th…

  37. ROADS MAY 15 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006774: SR 120 FROM JOHN WARD ROAD TO SR 5

    Under Construction · Resurface & Maintenance · Cities: Marietta, Not City · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 120 to improve the roadways current low OCI …

  38. ROADS MAY 02 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006767: I-75 & I-285 @ 4 LOCS IN COBB COUNTY - BRIDGE PREVENTATIVE

    Construction Work Program · Bridges · Cities: Kennesaw, Marietta, Not City · Funding: NEPA · Bridge Rehabilitation. The work will consist of deck rehabilitation, replacement of edge beams, joint replacement, painting the…

  39. ROADS MAY 01 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0021265: SR 6/US 278 @ RICHARD D SAILORS PKWY

    Construction Work Program · Operational Improvement · Cities: Powder Springs · The proposed improvements include constructing a dedicated westbound through lane and the restriping of eastbound lanes to eliminate signal s…

  40. ROADS APR 25 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0020001: JOHNSON FERRY ROAD @ SHALLOWFORD ROAD

    Construction Work Program · Intersection Improvement · Cities: Not City · Funding: NEPA · The delivery of this project will be design-build: The Project will provide design and construction services to widen and reconfig…

  41. ROADS APR 21 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0020764: I-75 @ I-285 EB - TUNNEL LIGHTING

    Under Construction · Lighting · Cities: Not City · Funding: NEPA · The purpose of this project is to upgrade the existing tunnel lighting from HPS to energy-efficient LED fixtures. Scope of work may also include replacem…

  42. ROADS APR 21 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0020000: I-75 NB @ WINDY HILL ROAD - TUNNEL LIGHTING

    Under Construction · Lighting · Cities: Not City · Funding: NEPA · The purpose of this project is to upgrade the existing tunnel lighting from HPS to energy-efficient LED fixtures. Scope of work may also include replacem…

  43. ROADS MAR 14 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0021201: BARRETT PARKWAY FROM VILLA RICA ROAD TO RIDENOUR BLVD

    Construction Work Program · Signals · Cities: Kennesaw, Marietta, Not City · Funding: NEPA · Located in Cobb County, the project begins at Villa Rica Road and ends at Ridenour Boulevard. The project intends to rebuild ei…

  44. ROADS MAR 13 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0021199: NOONDAY CREEK TRL EXT FROM BELLS FERRY TRL TO SHALLOWFORD RD

    Construction Work Program · Shared Use Path · Cities: Not City · Located in Cobb County, the project begins by tying to the existing end of the Noonday Creek Trail located in the Bells Ferry Trailhead and concludes by ty…

  45. ROADS MAR 06 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0021182: SR 5 SPUR @ SANDY PLAINS ROAD

    Construction Work Program · Operational Improvement · Cities: Marietta, Not City · The proposed improvement would provide dual right turn lanes approximately 485 ft in length on SR 5 for the eastbound approach. The addit…

  46. ROADS JAN 22 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project 0021092: I-75 & I-85 @ 4 LOCS - RAMP METER IMPROVEMENTS

    Construction Work Program · ITS · Cities: Kennesaw, Not City, South Fulton, Union City · Funding: GEPA · The project proposes increasing capacity to improve queuing caused by the ramp meter, as well as upgrading the curr…

  47. ROADS JAN 21 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006714: I-75 NB NOISE WALLS @ 6 LOCS N OF WADE GREEN ROAD IN COBB CO

    Construction Work Program · Walls · Cities: Not City · I-75 NB NOISE WALLS @ 6 LOCS N OF WADE GREEN ROAD IN COBB CO

  48. ROADS JAN 16 2025 · COBB · GEORGIA DOT PROJECT HUB

    Road project M006555: SR 3/US 41 FROM FULTON COUNTY LINE TO TERRELL MILL ROAD

    Under Construction · Resurface & Maintenance · Cities: Marietta, Not City, Smyrna, Vinings · Funding: GEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 3/US 41 to improve the road…