Boulder, CO permit…
This closed; description: demo single family new construction permit covers Boulder, CO permit… in Boulder, filed June 17, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 26 records on Hartford Drive from Aug 12, 2025 through Aug 12, 2026, including 26 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect New construction work with HVAC, Gutters, Driveway/concrete, Landscaping, Security/low-voltage, Solar, Fence, Window treatment, Cleaning as common follow-on categories.
- HVAC
- Gutters
- Driveway/concrete
- Landscaping
- Security/low-voltage
- Solar
- Fence
- Window treatment
- Cleaning
RECORD ACTIVITY
Activity timeline
-
AUG 3, 2026
Boulder, CO permit 8bab03b7-9e55-49c4-9b74-fa4f1836f59f: Building Permit - Single Family Detached Dwelling
permit · Deck/outdoor · Issued; Description: Construct a new two-story single-family home with a crawl space · $600,000 -
JUNE 17, 2026
Boulder, CO permit… This permit
Permit · New construction · Closed; Description: Demo single family detached dwelling *A -
MAY 8, 2026
Boulder, CO permit f275e4c2-3fdc-4d40-b8cd-e64101f69ca1: Electrical Permit
permit · Electrical · Closed; Description: We need to have temp service power pole installed on the S