PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit…

Boulder · Boulder, CO County

Electrical permit

This letter of completion; description: 200a electrical permit covers Boulder, CO permit… in Boulder, filed June 15, 2026, with an estimated value of $4,500.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 8 records on Orion Court from Aug 12, 2025 through Aug 12, 2026, including 8 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 10% vs prior 30 days685 permits vs 621 · through Aug 10, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.

  • Generator
  • EV charger
  • Solar
  • Smart home/low-voltage

RECORD ACTIVITY

Activity timeline

  1. JUNE 15, 2026

    Boulder, CO permit… This permit

    Permit · Electrical · Letter of Completion; Description: 200A Main Panel Upgrade · $4,500
  2. FEB 27, 2026

    Boulder, CO permit 16446add-9ef2-47ff-9236-5bd450aca10a: Mechanical Permit

    permit · Water heater · Letter of Completion; Description: Installation of a 50 Gallon GE GeoSpring Hybrid Heat Pump Water Heater · $4,470
  3. FEB 17, 2026

    Boulder, CO permit 9916c1b1-3cba-4d31-b0c4-6c5e7c9e53e5: Mechanical Permit

    permit · HVAC · Letter of Completion; Description: Removal of Existing HVAC System and installation of new 3 Ton Ducted Mitsubishi Heat · $16,123