PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit…

Boulder · Boulder, CO County

Demolition permit

This issued; description: demo entire cinder demolition permit covers Boulder, CO permit… in Boulder, filed June 10, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 8 records on Norwood Avenue from Aug 12, 2025 through Aug 12, 2026, including 8 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 10% vs prior 30 days685 permits vs 621 · through Aug 10, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Demolition work with New-construction GC, Hauling/dumpster as common follow-on categories.

  • New-construction GC
  • Hauling/dumpster

RECORD ACTIVITY

Activity timeline

  1. JUNE 10, 2026

    Boulder, CO permit… This permit

    Permit · Demolition · Issued; Description: Demo entire cinder Block building with