Boulder, CO permit…
This issued; description: temporary power for new construction permit covers Boulder, CO permit… in Boulder, filed June 4, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 21 records on Juniper Avenue from Aug 12, 2025 through Aug 12, 2026, including 21 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect New construction work with HVAC, Gutters, Driveway/concrete, Landscaping, Security/low-voltage, Solar, Fence, Window treatment, Cleaning as common follow-on categories.
- HVAC
- Gutters
- Driveway/concrete
- Landscaping
- Security/low-voltage
- Solar
- Fence
- Window treatment
- Cleaning
RECORD ACTIVITY
Activity timeline
-
JUN 23, 2026
Boulder, CO permit eb8b132c-fed8-4b73-a350-818051efe014: Right-of-Way Permit
permit · Demolition · Issued; Description: Gas demo (1) 5x5 street cut (3) potholes **contractor must notify impacted residents 72 hrs in adva · $1,000 -
JUNE 4, 2026
Boulder, CO permit… This permit
Permit · New construction · Issued; Description: Temporary power for home deconstruction