PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit…

Boulder · Boulder, CO County

EV charger permit

This letter of completion; description: run n ev charger permit covers Boulder, CO permit… in Boulder, filed May 15, 2026, with an estimated value of $1,000.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 12 records on Gillaspie Drive from Aug 12, 2025 through Aug 12, 2026, including 12 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 10% vs prior 30 days685 permits vs 621 · through Aug 10, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect EV charger work with Electrician (panel upgrade), Solar as common follow-on categories.

  • Electrician (panel upgrade)
  • Solar

RECORD ACTIVITY

Activity timeline

  1. MAY 15, 2026

    Boulder, CO permit… This permit

    Permit · EV charger · Letter of Completion; Description: Run new 240v circuit from · $1,000
  2. MAY 13, 2026

    Boulder, CO permit aa71e349-03ff-4a18-8140-ac94445c0d8a: Right-of-Way Permit

    permit · Unclassified · Closed; Description: WO 109972302 - Road closure and detour for crane set to replace 1 - 40' pole and upgrade equipment, · $1,000
  3. APR 8, 2026

    Boulder, CO permit 00eb7367-7f40-45e1-a524-66a74e1c736e: Mechanical Permit

    permit · HVAC · Letter of Completion; Description: 3 ton electric heat pump installation replacing an existing gas furnace · $16,990
  4. MAR 3, 2026

    Boulder, CO permit d4ea19a1-192d-44ed-839d-423d51359e4c: Electrical Permit

    permit · Electrical · Letter of Completion; Description: Upgrade meter and main panel from 100 amps to 200 amps · $1,800