Boulder, CO permit…
This letter of completion; description: repla electrical permit covers Boulder, CO permit… in Boulder, filed April 27, 2026, with an estimated value of $18,411.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 13 records on Poplar Avenue from Aug 12, 2025 through Aug 12, 2026, including 13 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
APRIL 27, 2026
Boulder, CO permit… This permit
Permit · Electrical · Letter of Completion; Description: Replacing a panel and add · $18,411 -
APR 8, 2026
Boulder, CO permit 6e41071c-d926-4f84-803b-da7b22ab45de: Mechanical Permit
permit · HVAC · Letter of Completion; Description: Replacing 2 ton 16 seer ac and coil 5/7/26**ADD Replacing 80% 45MBTUH gas furnace** * · $18,411