PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit…

Boulder · Boulder, CO County

Solar permit

This issued; description: **all structures mu solar permit covers Boulder, CO permit… in Boulder, filed April 22, 2026, with an estimated value of $9,029.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 13 records on Heidelberg Drive from Aug 12, 2025 through Aug 12, 2026, including 13 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 10% vs prior 30 days685 permits vs 621 · through Aug 10, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Solar work with Roofers (pre-install inspect), Battery/backup, EV charger, Electricians as common follow-on categories.

  • Roofers (pre-install inspect)
  • Battery/backup
  • EV charger
  • Electricians

RECORD ACTIVITY

Activity timeline

  1. JUN 29, 2026

    Boulder, CO permit b3a3d098-cae8-4bb8-846f-127f4f1df2f8: Electrical Permit

    permit · Electrical · Letter of Completion; Description: Installation of one Tesla Powerwall 3 energy storage system · $9,402
  2. APRIL 22, 2026

    Boulder, CO permit… This permit

    Permit · Solar · Issued; Description: **All Structures must be permitted sepa · $9,029