PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit 0acc7325-f479-4eec-…

Boulder · Boulder, CO County

Electrical permit

This closed; description: temporary power nee electrical permit covers Boulder, CO permit 0acc7325-f479-4eec-… in Boulder, filed April 16, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 16 records on Pleasant Street from Aug 12, 2025 through Aug 12, 2026, including 16 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 10% vs prior 30 days685 permits vs 621 · through Aug 10, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.

  • Generator
  • EV charger
  • Solar
  • Smart home/low-voltage

RECORD ACTIVITY

Activity timeline

  1. MAY 20, 2026

    Boulder, CO permit 70445553-46d1-4225-af01-5cc581c21a2c: Demolition Permit

    permit · New construction · Issued; Description: Full Deconstruction of a single family dwelling constructed in 1922
  2. MAY 20, 2026

    Boulder, CO permit d48ff23e-aae4-4fdd-b5a3-dda75c65e014: Demolition Permit

    permit · New construction · Issued; Description: Deconstruct detached Garage
  3. APRIL 16, 2026

    Boulder, CO permit 0acc7325-f479-4eec-… This permit

    Permit · Electrical · Closed; Description: temporary power needed for deconstructi