Boulder, CO permit…
This issued; description: we are proposing to new construction permit covers Boulder, CO permit… in Boulder, filed April 14, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 26 records on Hawthorn Avenue from Aug 12, 2025 through Aug 12, 2026, including 26 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect New construction work with HVAC, Gutters, Driveway/concrete, Landscaping, Security/low-voltage, Solar, Fence, Window treatment, Cleaning as common follow-on categories.
- HVAC
- Gutters
- Driveway/concrete
- Landscaping
- Security/low-voltage
- Solar
- Fence
- Window treatment
- Cleaning
RECORD ACTIVITY
Activity timeline
-
JUL 27, 2026
Boulder, CO permit 3194a372-cbd2-4f42-a4af-e7c068e0dbe6: Right-of-Way Permit
permit · Unclassified · Issued; Description: Installing 3 new poles, 2 down guys, and a pedestal · $500 -
JUN 5, 2026
Boulder, CO permit 62641c7b-1a35-4660-8982-d0cd452fa58e: Right-of-Way Permit
permit · Unclassified · Issued; Description: Residential OH to UG electric distribution conversion: Install 40' pole, wire, 25kva XFMR, 50kva XF · $1,200 -
APRIL 14, 2026
Boulder, CO permit… This permit
Permit · New construction · Issued; Description: We are proposing to build a new two sto