PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit…

Boulder · Boulder, CO County

Electrical permit

This issued; description: meter panel upgrade electrical permit covers Boulder, CO permit… in Boulder, filed March 27, 2026, with an estimated value of $5,500.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 3 records on Edison Lane from Aug 12, 2025 through Aug 12, 2026, including 3 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 10% vs prior 30 days685 permits vs 621 · through Aug 10, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.

  • Generator
  • EV charger
  • Solar
  • Smart home/low-voltage

RECORD ACTIVITY

Activity timeline

  1. JUL 23, 2026

    Boulder, CO permit dbf10615-4891-44eb-b199-7c396e1cb942: Electrical Permit

    permit · EV charger · Letter of Completion; Description: Install EV charger for single family attached dwelling · $1,650
  2. MAY 7, 2026

    Boulder, CO permit c270a0a7-8869-4477-9ca4-41494d410ae5: Mechanical Permit

    permit · HVAC · Issued; Description: Installing a 2 · $18,895
  3. MARCH 27, 2026

    Boulder, CO permit… This permit

    Permit · Electrical · Issued; Description: Meter panel upgrade to 200amp · $5,500