Boulder, CO permit…
This closed; description: temp power for futu electrical permit covers Boulder, CO permit… in Boulder, filed March 26, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 6 records on Tamarack Avenue from Aug 12, 2025 through Aug 12, 2026, including 6 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
APR 21, 2026
Boulder, CO permit c4f478af-32dc-4bc6-8348-38519d749c64: Demolition Permit
permit · New construction · Issued; Description: Full structure deconstruction fo a single family detached dwelling -
APR 21, 2026
Boulder, CO permit 4965ae1c-4acf-408d-bbb7-790e5f0382e8: Demolition Permit
permit · New construction · Issued; Description: Full structure deconstruction of two accessory wood sheds (400sf total) -
MARCH 26, 2026
Boulder, CO permit… This permit
Permit · Electrical · Closed; Description: temp power for future construction *Ass