PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit…

Boulder · Boulder, CO County

Electrical permit

This closed; description: temp power for futu electrical permit covers Boulder, CO permit… in Boulder, filed March 26, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 6 records on Tamarack Avenue from Aug 12, 2025 through Aug 12, 2026, including 6 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 10% vs prior 30 days685 permits vs 621 · through Aug 10, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.

  • Generator
  • EV charger
  • Solar
  • Smart home/low-voltage

RECORD ACTIVITY

Activity timeline

  1. APR 21, 2026

    Boulder, CO permit c4f478af-32dc-4bc6-8348-38519d749c64: Demolition Permit

    permit · New construction · Issued; Description: Full structure deconstruction fo a single family detached dwelling
  2. APR 21, 2026

    Boulder, CO permit 4965ae1c-4acf-408d-bbb7-790e5f0382e8: Demolition Permit

    permit · New construction · Issued; Description: Full structure deconstruction of two accessory wood sheds (400sf total)
  3. MARCH 26, 2026

    Boulder, CO permit… This permit

    Permit · Electrical · Closed; Description: temp power for future construction *Ass