PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit…

Boulder · Boulder, CO County

HVAC permit

This letter of completion; description: 3277 hvac permit covers Boulder, CO permit… in Boulder, filed March 18, 2026, with an estimated value of $515,416.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 9 records on Commerce Street from Aug 13, 2025 through Aug 13, 2026, including 9 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 13, 2025 through Aug 13, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 10% vs prior 30 days685 permits vs 621 · through Aug 10, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect HVAC work with Insulation, Duct cleaning, Smart thermostat, Air quality, Solar as common follow-on categories.

  • Insulation
  • Duct cleaning
  • Smart thermostat
  • Air quality
  • Solar

RECORD ACTIVITY

Activity timeline

  1. JUN 26, 2026

    Boulder, CO permit f6481bfb-f77f-40f1-a6e0-1e9883cd1a8d: Fire Permit

    permit · Unclassified · Issued; Description: Fire Alarm Permit · $9,827
  2. JUN 25, 2026

    Boulder, CO permit 72b59769-5c3c-4bdd-9b20-842c768f25b8: Electrical Permit

    permit · Electrical · Issued; Description: Remove and Replace Existing FPE Panels *AD Building and Tech Building · $81,348
  3. JUN 22, 2026

    Boulder, CO permit ef3848bc-dc5a-48a3-9f8d-d6779d1ac5f9: Fire Permit

    permit · Unclassified · Issued; Description: Install a new wet pipe fire sprinkler system off of the existing sprinkler system below a 511 sq · $8,500
  4. MAY 27, 2026

    Boulder, CO permit 42664c92-7c95-4dc8-b9dd-24f560450a3c: Wireless Facility Permit

    permit · Unclassified · Letter of Completion; Description: Related to permit ADR2025-00401 and ELE2026-00068 · $120,000
  5. APR 24, 2026

    Boulder, CO permit 33b48884-16db-4ceb-ae56-fca970f6e9ee: Electrical Permit

    permit · Electrical · Letter of Completion; Description: Related to permit ADR2025-00401 and WCF2026-00002 · $40,000
  6. MARCH 18, 2026

    Boulder, CO permit… This permit

    Permit · HVAC · Letter of Completion; Description: 3277 sf remodel of an exi · $515,416
  7. FEB 27, 2026

    Boulder, CO permit 81236c36-0918-4d29-9776-b85b1be52f9e: Fire Permit

    permit · Unclassified · Issued; Description: (FATI) Install new monitor modules to monitor alarm, trouble, & supervisory of TVAC chamber fire su · $14,394
  8. FEB 27, 2026

    Boulder, CO permit 50095b60-be72-4e89-99d5-18659912caff: Fire Permit

    permit · Unclassified · Letter of Completion; Description: Fire sprinkler modifications for tenant finish in Simulation Lab area (Room 2D308) · $5,218
  9. FEB 19, 2026

    Boulder, CO permit 7e3cf68d-ad96-44a6-af23-cb27b57316a3: Fire Permit

    permit · Unclassified · Letter of Completion; Description: Installing a Pre-Action System, Vesda System and Fire Alarm system (FATI) · $98,000